Laserfiche WebLink
Chris Gilbreath <br />Page 2 <br />October 6, 2014 <br />drainage areas have incomplete polygons, namely West 3 and East 1. North of sub-basin East 1, the <br />topography does not agree with the drainage boundary. Is it correct for the drainage boundary for <br />the sub-basin that drains directly to the pond to extend east of the hilltop signified by the 5775 <br />contour? Please revise the map to accurately show the drainage areas and topography. <br />4. In the disclaimer for Appendix 2.05.3(4)-1, the ARCADIS report, there is a note that information on <br />“specific” segments of the ditches draining to Pond NHN-001 is superseded by the new appendix <br />(Appendix 2.05.3(4)-7). However, the Division understands that all of the segments of these ditches <br />are included in the new design. If we are correct, it would be clearer to the reader to revise this <br />disclaimer to refer to all segments of these ditches. Please make this revision or explain why it is <br />not appropriate. <br /> <br /> <br />If you have any questions, please contact me at 303.866.3567 (extension 8113) or <br />Rob.Zuber@state.co.us. <br /> <br />Sincerely, <br /> <br /> <br /> <br />Robert Zuber, P.E. <br /> <br />Environmental Protection Specialist <br /> <br /> <br /> <br />