Laserfiche WebLink
COMPACTION WORK <br />Task description: Compact Refuse on Gob Pile #2 <br />Site: Bowie No. 2 Mine Permit Action: Midterm Review 4 Permit/Job #: C 1996083 <br />PROJECT IDENTIFICATION <br />Task #: 039 State: Colorado <br />Date: 10/2/2014 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Abbreviation: None <br />Filename: C083 -039 <br />Basic Machine: CAT 815F Horsepower: <br />Compactor Type: Soil - tamping foot Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />MATERIAL OUANTITIES <br />240 <br />1 per day <br />(CRG) <br />Loose volume: 200,000 <br />LCY <br />Utilization % <br />Ownership Cost/flour: <br />$36.81 <br />NA <br />Operating Cost/Hour: <br />$82.25 <br />100 <br />Operator Cost/Hour: <br />$28.75 <br />NA <br />Total Unit Cost/flour: <br />$147.81 <br />6.50 <br />Total Fleet Cost/flour: <br />$147.81 <br />4.00 <br />MATERIAL OUANTITIES <br />240 <br />1 per day <br />(CRG) <br />Loose volume: 200,000 <br />LCY <br />Shrinkage factor: 0.900 <br />Compacted volume: 180,000 <br />CCY <br />Source of estimated volume: Page 2.05 -45 <br />Source of estimated shrinkage factor: Cat Handbook <br />HOURLY PRODUCTION <br />Unadjusted hourly production = (W x S x L x C) / P <br />Compacted width per pass (W): <br />6.50 <br />feet <br />Average Compactor Speed (S): <br />4.00 <br />mph <br />Compacted thickness of each lift (L): <br />10.00 <br />inches <br />Conversion Constant (C): <br />16.3 <br />(5,280ft. /12in. /27cu.ft.) <br />Required number of machine passes (P): <br />3 <br />passes <br />Unadjusted Hourly Unit Production: <br />1,412.67 <br />CCY/hour <br />Job Condition Correction Factors <br />Site Altitude: 6,100 feet <br />Source <br />Altitude Adj: 1.00 <br />(CAT HB) <br />Job Efficiency: 0.83 <br />(1 shift /day) <br />Net Correction: 0.8300 <br />multiplier <br />Adjusted Hourly Unit Production: <br />1,172.51 <br />CCY/Hour <br />Adjusted Hourly Fleet Production: <br />1,172.51 <br />CCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 <br />Compactor(s) <br />Total job time: 153.52 Hours <br />Unit cost: $0.126 per CCY Total job cost: $22,691 <br />