Laserfiche WebLink
Total Truck Cycle Time: 35.548 <br />Loading Tool unit <br />Production 423.28 LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />19.05 LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 22 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 126.50 <br />Adjusted single truck/loader team production: 126.50 <br />Adjusted multiple truck/loader team production: 126.50 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $7.649 /LCY <br />minutes <br />351.32 LCY/Hour <br />15.81 LCY/Hour <br />8 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 26.68 Hours <br />Total job cost: $25,814 <br />