My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-06_GENERAL DOCUMENTS - C1996083
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1996083
>
2014-10-06_GENERAL DOCUMENTS - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:31 PM
Creation date
10/6/2014 1:51:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
10/6/2014
Doc Name
Midterm Review Midterm/Cost Estimate (MT4)
From
DRMS
Permit Index Doc Type
Findings
Email Name
SLB
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Bowie No. 2 Mine <br />HYDRAULIC EXCAVATOR WORK <br />Pull Material Back onto Train L/O Facil. and Railbed Benches <br />Permit Action: Midterm Review 4 <br />PROJECT IDENTIFICATION <br />Task #: 010 State: Colorado <br />Date: 10/3/2014 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 365C L 13' -7" Stick <br />Attachment 1: ROPS Cab <br />Permit/Job #: C1996083 <br />Abbreviation: None <br />Filename: C083 -010 <br />Horsepower: <br />404 <br />Weight (MT): <br />70 -51 <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Total Fleet Cost/Hour: $496 -17 <br />MATERIAL QUANTITIES <br />Initial volume: 231,495 CCY Swell factor: <br />Loose volume: 231,495 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swim loaded, dump bucket, swing empty): <br />Load Bucket Capacity <br />Basic Job Condition Description: <br />Secondary Job Condition within Basic Description: <br />Cycle Time Value: <br />I WITIo, <br />SEVERE <br />SEVERE <br />0 -570 <br />minutes <br />Bucket Size Class: Small <br />Rated Capacity: 3 -61 LCY (heaped) <br />Bucket Fill Factor: 0 -850 Hard, tough clay (80% - 90 %) 0 -850 <br />Adjusted Capacity: 3.07 LCY <br />Job Condition Correction Factors Site Altitude: 5900 feet <br />Source <br />Altitude Adj: 1 -00 (CAT HB) <br />Job Efficiency: 0 -83 (1 shift /day) <br />Net Correction: 0 -83 multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />323 -00 <br />268 -09 <br />536.18 <br />Fleet size: 2 Excavator Total job time: <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />431.75 <br />Unit cost: $0 -925 /LCY Total job cost: $214,221 <br />BULLDOZER WORK <br />Hours <br />Utilization % <br />Ownership Cost/Hour: <br />$75 -46 <br />NA <br />Operating Cost/Hour: <br />$144 -45 <br />100 <br />Operator Cost/Hour: <br />$28 -17 <br />NA <br />Total Unit Cost/Hour: <br />$248 -09 <br />Total Fleet Cost/Hour: $496 -17 <br />MATERIAL QUANTITIES <br />Initial volume: 231,495 CCY Swell factor: <br />Loose volume: 231,495 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swim loaded, dump bucket, swing empty): <br />Load Bucket Capacity <br />Basic Job Condition Description: <br />Secondary Job Condition within Basic Description: <br />Cycle Time Value: <br />I WITIo, <br />SEVERE <br />SEVERE <br />0 -570 <br />minutes <br />Bucket Size Class: Small <br />Rated Capacity: 3 -61 LCY (heaped) <br />Bucket Fill Factor: 0 -850 Hard, tough clay (80% - 90 %) 0 -850 <br />Adjusted Capacity: 3.07 LCY <br />Job Condition Correction Factors Site Altitude: 5900 feet <br />Source <br />Altitude Adj: 1 -00 (CAT HB) <br />Job Efficiency: 0 -83 (1 shift /day) <br />Net Correction: 0 -83 multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />323 -00 <br />268 -09 <br />536.18 <br />Fleet size: 2 Excavator Total job time: <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />431.75 <br />Unit cost: $0 -925 /LCY Total job cost: $214,221 <br />BULLDOZER WORK <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.