Laserfiche WebLink
Altitude: 1.000 <br />(CAT HB) <br />Material Weight: 0.793 <br />(CAT HB) <br />Blade type: 1.000 <br />(PAT) <br />Net correction: 0.4344 <br />Adjusted unit production: 746.69 LCY /hr <br />Adjusted fleet production: 2986.76 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.459/LCY <br />Total job time: <br />Total job cost: <br />4.48 Hours <br />43 <br />