Laserfiche WebLink
10/3/2014 State.co.us Executive Branch Mail - Re: Bowie No. 2 Mine C1996083 - Midterm Review (MT4) Request for Assistance <br />inadequate. <br />would appreciate having your comments (reviewed /approved by Dan as necessary) to me in final form by <br />COB October 1, 2014. Thanks. <br />For your reference, the midterm review is required under Rule 2.08.3. <br />Revisions currently under review include: <br />PR -14 to incorporate the Spruce Stomp lease and associated mine plan. <br />TR -92 to substitute PVC ditch lining for rip rap on a Gob Pile #3 ditch (J11). <br />TR -91 to ensure that sediment control features are consistent in the permit and on the ground. <br />TR -87 to enlarge Pond D. <br />MR -161 to permit temporary culverts near Gob Pile #1. <br />The electronic permit document in Laserfiche is current, as are the binders in my office. Pending revisions are <br />located on my desk in the vertical files next to my window. Please feel free to use any materials in my office. <br />Susan L. Burgmaier <br />Protection Environmental r- ,,: <br />Coal Regulatory ! r S <br />COLORADO <br />i Division of Reclani,atiort, <br />Mird:rtg and Safety <br />[)eparti'nen� of Nahiral Resources <br />1313 Sherman Street, Room 215, Denver, CO ,0 <br />susan.burgmaier@state.co.us I http://mining.state.co.] <br />https: / /mail.google.com /mail /u /0 / ?ui= 2 &ik= e29129fcb5& view =pt& search = inbox& th= 148d2e161f98f19c &siml= 148d2e161f98f19c 2/2 <br />