My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-01_REVISION - M1981250
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981250
>
2014-10-01_REVISION - M1981250
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:51 PM
Creation date
10/2/2014 8:34:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981250
IBM Index Class Name
Revision
Doc Date
10/1/2014
Doc Name
TR Submittal- Weed Control Plan.
From
Yuma County Road and Bridge
To
DRMS
Type & Sequence
TR1
Email Name
TAK
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of co<o - j e rr <br /> COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> *x 1876 * 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> File No.: M- qg/"ZSo Site Name: F 94N� p,T <br /> County %urr/A TR# Use onl <br /> Permittee; ykmA coun/Py' F%�p�l Anal Qh'� c�6� <br /> nC7 01 2014 <br /> Operator(If Other than Permittee): 91111ep- P. <br /> / RECLAMATION <br /> r <br /> Permittee Representative: �i +�yis MININGANp SAFETY <br /> Please provide a brief description of the proposed revision: MDOS �I6�� C.o��i Ro C /5ryw <br /> Pz9ti <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type -Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 El <br /> 1 IOd, 112d(1, 2 or 3) $1006 F <br />
The URL can be used to link to this page
Your browser does not support the video tag.