Laserfiche WebLink
J <br /> 4SPECTION OF MINING OPERATION <br /> PIKE NATIONAL FOREST, SOUTH PARK RANGER DISTRICT -20, (j(> <br /> Inspection Date, Time July 9, 2014 <br /> Claim Name American Dream Mine—American Dream/ Laramie Cowboy claims <br /> Operator Name/Signature_Joe Dorris_ <br /> fo� DR � S <br /> Inspector Name/Signature Amy Titterington, Geologist <br /> Remarks <br /> I accompanied USFS Wildlife Biologist Kristen Meyer and USFS Wildlife Biologist Tech Bob Wiltzen to the <br /> American Dream/Laramie Cowboy claims to help them complete their Biological Evaluation (BE) of the site. <br /> Mr. Dorris currently has an NOI for the site, and I am in the process of completing his Plan of Operations for 4 <br /> exploratory excavations. I was able to locate all 4 sites. The claims are free of any trash, and all excavations <br /> have been backfilled to reduce erosion. <br /> Recommendations <br /> Continue to process Mr. Dorris' Plan of Operations. The Biological and Cultural surveys are complete. Once I <br /> receive the survey results, I will begin the NEPA process (CE). <br />