Laserfiche WebLink
Mr. McGraw <br /> Page 2 <br /> September 30, 2014 <br /> 4. The Operator is proposing to import rap brick over a period of ten years, with the imported <br /> material remaining in a stockpile unti the operation enters final reclamation. Please note that <br /> the Division must bond for all non-pr duct stockpiles which will be used during reclamation. <br /> Alternately, the Operator may backfil I the scrap brick into the pit as it is imported to the site. <br /> If the scrap brick is immediately bac filled, then an adjustment of the financial warranty will <br /> not be necessary. Please specify if the scrap brick will be stockpiled or if it will be backfilled <br /> upon importation of the material. <br /> This concludes the Division's prelimina adequacy review of this Technical Revision. Please <br /> remember that the decision date for TR-C 4 is October 17, 2014. As previously mentioned, if you <br /> are unable to provide satisfactory respon s to any inadequacies prior to this date, it will be your <br /> responsibility to request an extension of time to allow for continued review of this <br /> Technical Revision. If there are still u esolved issues when the decision date arrives and no <br /> extension has been requested, the Techni al Revision will be denied. <br /> If you need additional information please contact me at the Division of Reclamation, Mining and <br /> Safety, 1313 Sherman St., Room 215, Denver, CO 80203, by telephone at 303-866-3567, <br /> extension 8131, or by email at Tyler.OD nnell gstate.co.us. <br /> Sincerely, <br /> Tyler O'Donnell <br /> Environmental Protection Specialist <br /> cc: Tom Kaldenbach, DRMS <br />