Laserfiche WebLink
Centennial Mine Reclamation Report 2013 <br /> B-Mining Company <br /> Michael Moore, President <br /> The reclamation of the 8-ft diameter vent shaft and vent shaft area <br /> included the following actions: <br /> • '/a" steel plate was put over the hole. <br /> • 12'x12'x8" concrete slab with Y2" & 5/8" rebar in 16" grid pattern. <br /> Concrete was prepared with 5 sack mix. <br /> • The concrete slab was covered with approximately two feet (2') of <br /> muck/dirt and seeded. <br /> • Access road to the vent hole was ripped and water bars put in. <br /> Vent Shaft appearance after reclamation. <br /> r . <br /> Vent hole before reclamation. <br /> Centennial Mine Reclamation Work& Pictures Page 6 <br />