Laserfiche WebLink
Centennial Mine Reclamation Report 2013 <br /> B-Mining Company <br /> Michael Moore, President <br /> The final reclamation of the Centennial Mine portal, pad and access road was <br /> addressed as follows: <br /> • Reclamation work was started 9/22/2012 and cat work was handled by <br /> Sutherland Bros. <br /> • Approximately 20 tons of ore was hauled back underground in the mine. <br /> • In addition the ore pad waste was also taken back underground. <br /> • Sutherland Bros. used a cat to break up the cement pad and the area was <br /> covered with four feet (4') of muck. <br /> • Three (3) timber sets at the portal were removed and the area back filled <br /> approximately thirty feet (30') inward. <br /> • Then pushed dump approximately twenty feet (20') above portal to close <br /> portal off. <br /> E N r <br /> Picture of Centennial Mine portal before reclamation. <br /> Centennial Mine Reclamation Work& Pictures Page 1 <br />