Laserfiche WebLink
=- RECEIVED <br /> —�� SEP 292014 Page <br /> g 3 <br /> 210d Annual Re Ort DIVISION OF RECLAMATION, <br /> Permittee Name: RETY-MINERALS <br /> B -Minin Com an r c c <br /> O oration Name: Centennial tp <br /> Permit Number. <br /> Annual Fee Due: M- 989-068 _ ft< <br /> $518.00 County: San M. el <br /> Permit Acrea e: 4.80 Anniversary Date: ►�� <br /> S Dtomber 27,2013 <br /> According to C.R.S. 34-32.5-116 or 34-32-116, each Current Bond Amt: $14,320.00 <br /> the Annual Fee,an Annual Report and Map showing the extent of anniversary date of the e <br /> monitoring information, reclamation accomplished to date and dur current ing the Preceding p mot'an operator shall submit <br /> anticipated to occur during the upcoming year, any reclamation t disturbances to affected land,required <br /> dates for the beginning of active operations,and the date active t Operations e mg year, any new disturbance that e <br /> that will be performed during the upcoming year,the <br /> Information contained in this report will be reviewed by the Div'P ons ceased for the yes,-, <br /> inspection of the site. If, while completing this report,you learn that our ' <br /> act, it is advisable that the issues be rectified promptly to avoid Division upon receipt and prior to the next compliance <br /> Y site is not in compliance with the rules and the <br /> identification si Possible enforcement action. <br /> 1. Is the site <br /> gn posted in accordance with Rule 3.1.12(1). <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1 �==y - NO <br /> 3. Is the .12(2). <br /> mine site in final reclamation(all material extraction and stockpile removal is Complete)? S � NO <br /> If"YES,"please note time limits related to completion of reclamation Rule <br /> mplete). / NO <br /> 4• What was the date of last excavation,processing or haulingactivity 3.1.3. <br /> 5. Does the mine operate more than 180 days per year ty at the mine? <br /> If"NO",please review Rule 1.13 to assure that your mine is i YES <br /> 6• Has this mine been n compliance. <br /> granted: a)approval of TEMPORARY CESSATION Status? <br /> b)approval for INTERMITTENT OPERATION? YES NO <br /> 7• Number of acres currently affected(mining+incomplete <br /> y g incomplete and or un'eleased reclamation). <br /> 8. Number of acres that were newly affected during the current report ear. r V <br /> 9• Number of acres that were reclaimed during the current re ort Y <br /> p year. <br /> 10. Estimated new acreage to be affected in the next report year. <br /> 1 i. Estimated acres to be reclaimed in the next report 1 <br /> p year. <br /> 12. Tota]acr reclamation, since e <br /> es in various sta es of reclai <br /> Total acres nnitted minin activities be an: <br /> backfilled: Total acres <br /> seeded w/ Total acres Total acres <br /> a roved crux; G;��7 re/tlap ed 1 � mulched w/ <br /> Total acres <br /> graded: Total acres a roved mulch: <br /> fertilized w/ Topsoil <br /> C1 replacement Mulch application <br /> Seed a vd fertilizer: de th L rate(tons): <br /> : G <br /> application % Fertilizer <br /> method: application Mulch <br /> method: C, application <br /> method: L' <br />