Laserfiche WebLink
9/30/2014 State.co.us Executive Branch Mail - Re: Bowie No. 2 Mine C1996083 - Midterm Review (MT4) Request for Assistance <br />STATE, OF <br />COLORADO <br />Re: Bowie No. 2 Mine C1996O83 - Midterm Review (MT4) Request for <br />Assistance <br />Bowles - DNR, Brock <brock.bowles @state.co.us> Mon, Sep 29, 2014 at 3:50 PM <br />To: "Burgmaier - DNR, Susan" <susan.burgmaier @ state.co.us>, Daniel Hernandez - DNR <br /><daniel.hernandez @ state.co.us>, Alysha Hernandez <alysha.hernandez @state.co.us> <br />Susan, <br />have attached my comments for the mid -term 4 review at Bowie 2. If you need additional assistance, please let <br />me know. <br />Brock <br />On Wed, Sep 10, 2014 at 8:06 AM, Burgmaier- DNR, Susan <susan.burgmaier @state.co.us> wrote: <br />Leigh, Brock, and Marcia - <br />The midterm review for the Bowie No. 2 Mine is due on October 5, 2014 (October 3rd, since the 5th is a <br />Sunday). I am requesting your assistance with the review, and am asking you to review the permit for <br />compliance with the following rules, consistent with what you have looked at with PR -14 and other recent <br />revisions: <br />Leigh - Rules 2.04.5 (groundwater portion), 2.04.7(1), 2.05.6(3) as it pertains to groundwater, 4.05.11, 4.05.12, <br />4.05.13 (groundwater) <br />Marcia - Rules 2.05.3(8), 4.03 (engineering of roads - I'll look at drainage), 4.09, 4.10, 4.11 <br />Brock - Rules 2.04.9, 2.04.10, 2.04.11, 2.05.3(5), 2.05.4(2)(d), 2.05.4(2)(e), 2.05.6(2), 4.06, 4.15, and 4.18. <br />If you are requiring revisions to any pertinent section(s) of the permit, please include the Rule /Act cite that <br />supports your request, and identify the specific area (section, map, page) of the permit you found to be <br />inadequate. <br />would appreciate having your comments (reviewed /approved by Dan as necessary) to me in final form by <br />COB October 1, 2014. Thanks. <br />For your reference, the midterm review is required under Rule 2.08.3. <br />Revisions currently under review include: <br />PR -14 to incorporate the Spruce Stomp lease and associated mine plan. <br />TR -92 to substitute PVC ditch lining for rip rap on a Gob Pile #3 ditch (J11). <br />TR -91 to ensure that sediment control features are consistent in the permit and on the ground. <br />TR -87 to enlarge Pond D. <br />MR -161 to permit temporary culverts near Gob Pile #1. <br />The electronic permit document in Laserfiche is current, as are the binders in my office. Pending revisions are <br />located on my desk in the vertical files next to my window. Please feel free to use any materials in my office. <br />Susan L. Burgmaier <br />Environmental Protection Specialist III <br />Coal Regulatory Program <br />https: / /mail.google.com /mail /u /0 / ?ui= 2 &ik= e29129fcb5& view =pt& search = inbox& th= l48c364b8d353d65 &siml= 148c364b8d353d65 1/2 <br />