My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-25_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-09-25_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:06 PM
Creation date
9/30/2014 7:40:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
9/25/2014
Doc Name
Adequacy Review and Reclamation Cost Estimate
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
MR162
Email Name
SLB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 6 <br />COST SUMMARY WORK <br />Task description: Remove Temporary Culverts/Reclaim New Disturbance <br />Permit Action: Minor Revision <br />Site: Bowie No. 2 Mine 162 Permit /Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: OOW State: Colorado <br />Date: 9/25/2014 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C083 -OOW <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />123 <br />150 <br />373 <br />Replace topsoil from Stockpile E to Gob Pile #2 <br />SCRAPER1 <br />1 <br />1 <br />1 <br />1.34 <br />$786.00 <br />$2,380.00 <br />$360.30 <br />Drill Seed Mix 3 on Disturbed Area <br />REVEGE <br />4.00 <br />Remove Temporary Culverts F4 and F5 <br />DEMOLISH <br />4.00 <br />SUBTOTALS: <br />9.34 <br />$3,526 <br />INDIRECT COSTS <br />0.00 <br />OVERHEAD AND PROFIT: <br />Engineering work and/or contract/bid preparation: <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />0.00 hrs <br />Profit: <br />10.00% <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL O & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />$71.23 <br />$37.02 <br />$0.00 <br />$352.60 <br />$460.85 <br />$3,986.85 <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contract/bid preparation: <br />4.00% <br />Total = $159.47 <br />Reclamation management and /or administration: <br />3.13% <br />$124.79 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $745.11 <br />TOTAL BOND AMOUNT (direct + indirect) = $4,271.11 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.