My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-26_REVISION - P2010026 (3)
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2010026
>
2014-09-26_REVISION - P2010026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:33:05 AM
Creation date
9/29/2014 4:18:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010026
IBM Index Class Name
Revision
Doc Date
9/26/2014
Doc Name
Modification to an existing NOI form 2 MD04
From
Shell Frontier Oil & Gas Inc.
To
DRMS
Type & Sequence
MD4
Email Name
THM
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 (FORM 2 - Public filing) <br />11. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />The purpose of this NOI modification is to eliminate overlapping NOI coverage by adding the <br />wells from pads 135-4 and 138 -4 permitted under DRMS NOI #P- 2009 -024 to this NOI. All <br />other aspects of #P-2010-026 remain unchanged. <br />12. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity 3 Average Width 200 (ft) Average Length 250 (ft) <br />B. Drill Holes: Quantity 31 Depth see Table 1 (ft) Diameter see Table 1 (in) <br />C. Mud Pits: Quantity 0 Average Width na (ft) Average Length na (ft) All pits have been closed <br />Average Depth na (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />A total of 31 wells have been installed to date. See attached Table 1 for a complete <br />list. All containment pits have been closed and backfilled, all soil stockpiles covered <br />with erosion control material and/or reseeded, and appropriate storm water s <br />installed. Conshuction of surface facilities was completed in 2013. <br />F. Other Disturbances (please describe): <br />No change <br />G. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />No change <br />F. New Road(s): Length No change (ft) Width No change (ft) <br />Significantly Upgraded Road(s) Length No change (ft) Width No change (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />No change <br />
The URL can be used to link to this page
Your browser does not support the video tag.