Laserfiche WebLink
AGGREGATE INDUSTRIES-WCR, INC. <br /> HAZELTINE MINE-MONTHLY REPORTING FORM <br /> MONTH: AUGUST YEAR: 2014 <br /> AGRI-DRAIN STAFF GAUGE OBSERVATIONS <br /> Predicted water surface elevation w/agri-drain functioning-5038.59 <br /> Post Top Elevation-5043.73; Top of Staff Gauge 5040.08(3.65 down from post top)Top of Gauge Reading is 14.5 <br /> Weekly Monitoring/Maintenance <br /> Date Time Staff Gauge Difference from Top of Water Difference from Notes-Note weather conditions,recent weather events and any <br /> Reading Top of Staff Staff Gauge Elevation Predicted any maintenance performed(clean-out of screen,pipe,etc.) <br /> (ft-10ths) 14.5 Elevation (ft) ALSO:check if water is coming thru Fulton drains,particulalry when they dump. <br /> 08/01/14 9:45 12.46 2.04 5040.08 5038.04 -0.55 Cleaned&maintained. Close to.2.5"rain this week. Fulton Running high <br /> 08/08/14 7:25 10.20 4.30 5040.08 5035.78 -2.81 Cleaned&maintained. At flowline of pipe,0.2 up. 1.5"rain during week. <br /> 08/15/14 9:20 10.20 4.30 5040.08 5035.78 -2.81 Service&clean screens. Water stopping at that level. 3"in flowline. 2.2"rain this week. <br /> Service&clean racks. Water holding steadily. Ditch high. .05"rain this week. <br /> 08/22/14 7:10 10.28 4.22 5040.08 5035.86 -2.73 <br /> OS/29/14 9:50 10.20 4.30 5040.08 1 5035.78 -2.81 Clean&scrape moss. Fulton ditch high. No rain. <br />