Laserfiche WebLink
RECEIVED MAC <br /> DIVIGION OF RECLAMATION Page 2 of 3 <br /> 111 Annual Report <br /> F P FW 9716-- 00 <br /> Permittee Name: akewood Brick& Tile Permit Number: M-19-7 <br /> Company <br /> Operation Name: Doughty's Pit County: Jefferson <br /> Annual Fee Due: $323.00 Anniversary Date: September 30, 2014 <br /> Permit Acreage: 5.00 Current Bond Amt: 1 $8,385.00 <br /> According to C.R.S. 34-32.5-116 or 34-32-116,each year,on the anniversary date of the permit,an operator shall submit <br /> the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land,required <br /> monitoring information,reclamation accomplished to date and during the preceding year,any new disturbance that is <br /> anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations,and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If,while completing this report,you learn that your site is not in compliance with the rules and the <br /> act,it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES XN <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES X14 <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES X0 <br /> If"YES,"please note time limits related to completion of reclamation,Rule 3.1.3. <br /> 4. What was the date of last excavation,processing or hauling activity at the mine? on going <br /> 5. Does the mine operate more than 180 days per year? YES X?9 <br /> If"NO",please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a)approval of TEMPORARY CESSATION Status? VS NO <br /> b)approval for INTERMITTENT OPERATION? YES XN <br /> 7. Number of acres currently affected(mining+incomplete and or unreleased reclamation). 3.10 <br /> 8. Number of acres that were newly affected during the current report year. 0 <br /> 9. Number of acres that were reclaimed during the current report year. 0 <br /> 10. Estimated new acreage to be affected in the next report year. 0.5 <br /> 11. Estimated acres to be reclaimed in the next report year. 0 <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: 0 seeded w/ 0 w/topsoil 0 mulched w/ NA <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: 2.00 fertilized w/ NA replacement NA rate(tons/ac): NA <br /> a vd fertilizer: I depth in. <br /> Seed Fertilizer Mulch <br /> application NA application NA application NA <br /> method: method: method: <br />