Laserfiche WebLink
Zach Trujillo 1 -2- September 22, 2014 <br />4. Section 2.05.3(2) on page 2.05 -4 as incorrect acreage amount as compared to the <br />Division's approved acreage for t e Fruita Loadout. Please submit a revised page 2.05 -4 <br />with the correct acreage amount f r the Fruita Loadout as approved with TR -2. <br />CAM - Revised page 2.05 -4 is <br />From the i)Division's findings i <br />Description of Operation and R <br />be owned by the operator when <br />2.04.7 in the Fruita Loadout pei <br />under Map Codes 25 and 28 (w <br />Division only has two of the thi <br />Division the third water right cl <br />Entry and Water Rights. <br />the issuance of Fruita Loadout permit, under <br />amation Plans, it was stated that a third water right will <br />application is approved. When reviewing Section <br />t, it states three water rights are owned by the operator <br />r the same application), 33 and 34. Currently, the <br />water right claim documents. Please provide to the <br />i document to be inserted in Exhibit 01 - Right of <br />CAM - Enclosed is a copy of the (ary West Bot Wash PI water right and updated page <br />2.04 -26. <br />Sincerely, <br />J. E. Stover, P.E. <br />Consulting Engineer <br />Enclosure: <br />Volume I: Pages 2.03 -13, 2.03 -16, 2.04 -26 and 2.05 -4. <br />Volume I: Exhibits, Tab 1, Water Right Document <br />