Laserfiche WebLink
BULLDOZER WORK <br />Task description: Regrade Light Use Roads from MR's and TR's <br />Site: Deserado Mine Permit Action: 2012 Midterm Review Permit/Job #: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 047 State: Colorado <br />Date: 4/5/2012 County: Rio Blanco <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi - Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C018 -047 <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />$259.35 <br />$1,037.41 <br />MATERIAL QUANTITIES <br />Initial Volume: 16,369 <br />Swell factor: 1.111 <br />Loose volume: 18.186 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Permit Volume IV <br />Operator Study <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />200 feet <br />700.0 LCY /hr <br />Consolidated stockpile 1.0 <br />5% <br />5,300 feet <br />2,743 lbs /LCY <br />User Provided <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />Utilization % <br />Ownership Cost/Hour: <br />$80.19 <br />Dozing method: 1.000 <br />NA <br />Operating Cost/Hour: <br />$140.68 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />$259.35 <br />$1,037.41 <br />MATERIAL QUANTITIES <br />Initial Volume: 16,369 <br />Swell factor: 1.111 <br />Loose volume: 18.186 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Permit Volume IV <br />Operator Study <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />200 feet <br />700.0 LCY /hr <br />Consolidated stockpile 1.0 <br />5% <br />5,300 feet <br />2,743 lbs /LCY <br />User Provided <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 1.000 <br />(CAT HB) <br />Dozing method: 1.000 <br />(GEN.) <br />