Laserfiche WebLink
Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.900 <br />(SSD -FC) <br />0.903 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.838 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4239 <br />Adjusted unit production: <br />Adjusted fleet production: <br />RD 1.110 lu1W- 101IYOW" <br />185.58 LCY /hr <br />742.32 LCY /hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $1.398 /LCY <br />Total job time: <br />Total job cost: <br />119.73 Hours <br />$124,212.29 <br />Page 16 of 164 <br />CIRCES Cost Estimating Software <br />