Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT <br />Page 134 of <br />CIRCES Cost Estimating Software <br />job) <br />Haz Waste <br />10 Drums <br />Hazardous waste <br />10.00 <br />EA <br />$245.00 <br />$2,450.00 <br />Sampling <br />sampling and <br />analysis, per <br />sample <br />Transport to <br />300 Miles <br />Solid transport, <br />300.00 <br />MI <br />$3.85 <br />$1,155.00 <br />Disposal Site <br />large truck (max. <br />80 drums, 25 cy, <br />or 18 tons) - <br />Minimum <br />Disposal Charge <br />3 Tons <br />Dumpsite disposal <br />3.00 <br />TON <br />$290.00 <br />$870.00 <br />charge - Average <br />Rock Dust Bins <br />4,400 CF <br />Bldg. (MN) <br />4,400.00 <br />CF <br />$0.20 <br />$862.40 <br />demo. /on -site <br />disposal in <br />existing pit or cut <br />- Max. 10,000 ft. <br />haul <br />Rock Dust Bin <br />96 SF <br />Demo. and on -site <br />96.00 <br />SF <br />$3.20 <br />$307.20 <br />Floors <br />disposal in <br />existing pit, 12 in. <br />thick - Max. <br />10,000 ft. haul <br />Compressor <br />13,680 CF <br />Bldg. (MN) <br />13,680.00 <br />CF <br />$0.20 <br />$2,681.28 <br />Shed and Hoist <br />demo. /on -site <br />Building <br />disposal in <br />existing pit or cut <br />- Max. 10,000 ft. <br />haul <br />Compressor <br />1,368 SF <br />Demo. and on -site <br />1,368.00 <br />SF <br />$1.60 <br />$2,188.80 <br />Shed and Hoist <br />disposal in <br />Bldg. Floor <br />existing pit, 6 in. <br />thick - Max. <br />10,000 ft. haul <br />Remove B -Vent <br />92 LF <br />Fencing, chain <br />92.00 <br />LF <br />$2.74 <br />$252.08 <br />Shaft #2 Fence <br />link, including <br />posts and fabric - <br />8 ft. to 10 ft. high <br />10,000 Gallon <br />10,000 G <br />Excavate and load <br />3.00 <br />EA <br />$1,205.00 <br />$3,615.00 <br />Tanks (3) <br />tank onto trailer, <br />non - leaking - <br />9,000 gal. to <br />12,000 gal. <br />Remove Sludge <br />1,500 G <br />Remove sludge, <br />3.00 <br />EA <br />$361.00 <br />$1,083.00 <br />from Tanks <br />water, and rem. <br />product from tank <br />- 9,000 to 12,000 <br />gal. <br />Dispose of <br />1,500 G <br />Dispose of tank <br />1,500.00 <br />GAL <br />$6.00 <br />$9,000.00 <br />Sludge <br />sludge off -site - <br />Average <br />CO2 for Tank <br />450 LB <br />Insert dry ice <br />450.00 <br />LB <br />$2.56 <br />$1,152.00 <br />Cleaning <br />(CO2) into tank to <br />produce inert gas - <br />CIRCES Cost Estimating Software <br />