My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-25_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-09-25_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2020 4:54:04 AM
Creation date
9/26/2014 8:39:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
9/25/2014
Doc Name
Weekly CQA Report: Week ending 09/13/14
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameo"' <br /> II) Storm Water Management <br /> Best Management Practices (BMPs) are being performed. <br /> CQA ACTIVITIES: <br /> 1) Field Activities: Field activities and observation during this reporting period included. Slope grading <br /> and fill placement, underground working remediation and confirmatory drilling; geomembrane <br /> deployment, testing, and repair monitoring and certification; LVSCF acceptance for primary liner <br /> deployment: LVSCF and SSF sampling; HVSCS header installation; and Highway 67 straight-ec ging <br /> and guardrail work. <br /> II) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testing <br /> continued. <br /> The following samples were collected and returned to AMEC's laboratory for analysis: <br /> Low Volume Solution Collection Fill samples LVSCF 88 and 89(control samples) <br /> Low Volume Solution Collection Fill samples LVSCF 26-R and 27-R (Record samples) <br /> Select Structural Fill sample SSF 16-R (Record samples.) <br /> General Proiect Items <br /> Meetings and Discussions: <br /> Weekly Contractor Meeting September 10, 2014 (CC&V, AMEC, Ames) <br /> J_ Weekly CC&V Safety Meeting September 11, 2014 <br /> ➢ ECA daily safety meetings <br /> ➢ Ames daily safety meetings <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting, and scheduling are some of the tasks occurring between CC&V <br /> Projects, AMEC, and Ames. <br /> Miscellaneous: <br /> Low volume solution collection fill processing was completed; crusher operations returned to <br /> drain cover fill production. <br /> Straight-edging of previously profiled areas as well as various areas as defined by CDOT was <br /> performed at Highway 67; CDOT, Ames, CC&V, AMEC, and Yeh &Associates were present <br /> Guardrail was replaced at the Highway 67 overlook area. <br /> Deliveries: <br /> 12 rolls of 80-mil LLDPE geomembrane DSMS liner was delivered to ECA. <br /> Ames received HVSCS piping and staged it at the lay down yard west of the crusher. <br /> Submitted by: Eric Lorenson Date: September 17, 2014 <br /> Reviewed by: Date: September 17, 2014 <br /> Tim Burk <br /> Project Resident <br /> Phone: 719-689-2986 <br /> CC&V Projects —� <br /> Reviewed By Date: <br /> Reviewed By: L� Date: <br /> 2014 09 13-MLE2 WEEKLY FINAL Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.