Laserfiche WebLink
RECEIVED <br /> SEP 2 4 2014 <br /> pMSION OF RECLAMATION, <br /> MINING I Q� 112c Annual Report <br /> Permittee Name: Aggregate Industries- Permit Number: M-1977-436 <br /> WCR,Inc. <br /> Operation Name: Brighton Mine County: Adams <br /> Annual Fee Due: $791.00 1 Anniversary Date: August 28,2014 <br /> Permit Acreage: 287.40 Current Bond Amt: $1,579,215.00 <br /> According to C.R.S.34-32.5-116 or 34-32-116,each year, on the anniversary date ofthe permit, an operator shall <br /> submit the Annual Fee,an Annual Report and Map showing the extent of current disturbances to affected land, <br /> required monitoring information, reclamation accomplished to date and during the preceding year, any new <br /> disturbance that is anticipated to occur during the upcoming year, any reclamation that will be performed during <br /> the upcoming year, the dates for the beginning of active operations,and the date active operations ceased for the <br /> year, if any. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If,while completing this report, you learn that your site is not in compliance with the rules <br /> and the act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1) YES NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2) YES NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES NO <br /> If"YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br /> 4. What was the date of last excavation, processing or hauling activity at the mine? 2011 <br /> 5. Does the mine operate more or less than 180 days per year? MORE LESS <br /> If"LESS", please review Rule 1.13 to assure that your mine is in compliance. Reclamation only. <br /> 6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES NO <br /> b) approval for INTERMITTENT OPERATION? YES NO <br /> 7. Number of acres currently affected (mining+ incomplete and or unreleased reclamation) 230+/- <br /> 8. Number of acres that were newly affected during the current report year. 0 <br /> 9. Number of acres that were reclaimed during the current report year. See ma <br /> 10. Estimated new acreage to be affected in the next report year. 0 <br /> 11. Estimated acres to be reclaimed in the next report year. See ma <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: See attached map. <br /> Total acres Total acres Total acres Total acres <br /> backfilled: seeded w/ w/topsoil mulched w/ <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: fertilized w/ replacement rate (tons): <br /> apvd fertilizer: depth (in.): <br /> Seed Fertilizer Mulch <br /> grn�ino4i�n �nn�inn4i�n nnn�inn4i�n <br />