Laserfiche WebLink
ameO <br /> CRIPPLE CREEK &VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) <br /> SQUAW GULCH (VLF) & HWY 67 RE-ALIGNMENT MONITORING WEEKLY REPORT <br /> Owner: Cripple Creek&Victor Gold Mining Co. Project Number: 74201125NO <br /> Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: September 13, 2014 <br /> Location: Cripple Creek&Victor Gold Mine, CO <br /> Contractor: Ames Construction, Inc. <br /> Reporting Period: 09.7.2014 through 09.13.2014 <br /> Days S M T W T F S <br /> D D D D D O D <br /> Work Shifts <br /> N N N N N -N <br /> D=Day Shift N=Night Shift H=Holliday <br /> Ambient Temperature Ranges During Week Weather Conditions During Week: <br /> Highs: 54°F to 71°F Cloud Cover: Partly cloudy to overcast <br /> Lows: 28F to 46 <br /> oF Precipitation: Rain: Sun., Mon., Tue_, Wed., Fri. <br /> Wind: Variable <br /> Ames: Continuing construction tasks for the Valley Leach Facility(VLF). <br /> Planning: Continuing construction activities and scheduling for the VLF. <br /> CONSTRUCTION ACTIVITIES AND PROGRESS: <br /> 1) Earthworks <br /> A) VLF (PSSA, Phase 1, and 2) <br /> Topsoil/Overburden Stripping: None. <br /> Tree Grubbing and Clearing, Chipping: None. <br /> Production Drilling: No production drilling occurred in the VLF. <br /> Production Blasting: Production blasting occurred within the VLF near underground workir g <br /> UG#6639. <br /> Structural Fill: <br /> All structural fill material discussed below was placed and compacted per the project technical <br /> specifications unless otherwise stated. An AMEC Quality Assurance(QA) professional monitored <br /> material temperatures placed within fill areas. Average structural fill temperatures were above <br /> 32°F. <br /> Stockpiled cut material was hauled from ADR road station 15+00 to an area upslope of Bench A <br /> station A15+00. The material was placed as structural fill in approximately 3-foot lifts and was <br /> compacted. <br /> Ames cut material from Bench B and placed it as structural fill on the northeast temporary access <br /> 2014 09 13-MLE2 WEEKLY FINAL Page 1 17 <br />