My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-24_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2014-09-24_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:04 PM
Creation date
9/24/2014 10:34:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
9/24/2014
Doc Name
Adequacy Review and Cost Estimate
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
MR161
Email Name
ZTT
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br /> <br />September 24, 2014 <br /> <br /> <br />Scott Wanstedt <br />Blue Mountain Energy, Inc <br />3607 County Road 65 <br />Rangely, CO 81648 <br /> <br /> <br />Re: Deserado Mine (Permit No. C-1981-018) <br /> <br /> Minor Revision 161 (MR-161) <br /> Adequacy Review <br /> <br /> <br />Dear Mr. Scott Wanstedt: <br /> <br />The Colorado Division of Reclamation, Mining and Safety (Division) has received the Blue <br />Mountain Energy, Inc. (BME) submittal of Minor Revision 161 for the Deserado Mine. The <br />revision was received on September 9, 2014 and deemed completed on September 15, 2014. MR- <br />161 proposes to add and reroute nitrogen pipeline to include service from the recently approved <br />Nitrogen Plant #2. It was observed by the Division that an error existed for total amount of pipeline <br />bonded for. Currently, the Division has accounted and estimated for a total of 5,971 LF of nitrogen <br />pipe. With this revision, BME has proposed that with the additional nitrogen pipeline proposed with <br />MR-161, the total pipeline should amount to 43,000 LF (36,000 LF of 3 and 4 and 7,000 LF of <br />2). The Divisions cost estimate took the difference between the actual amount of 43,000 LF and <br />the 5,971 LF accounted for by the Division. It should noted, that the cost to reclaim 2, 3 and 4 <br />polyethylene pipe is the same according to section 02 41 13.5 of the RSMeans Site Work & <br />Landscape Cost Data 2014 (see attachment). The Division has the following comment: <br /> <br />Rule 3.02.2 Determination of Bond Amount <br /> <br /> <br />1.The Division has performed a cost estimate for the addition of a second nitrogen plant. The <br />total value of this estimate is $74,198.16 (see attached cost estimate). <br />estimate is consistent with previous cost estimates approved by both the Division and BME. <br />The Division respectfully requests a response from BME with any questions regarding the <br />1313 Sherman Street, Room 215, Denver, CO 80203P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br /> <br />John W. Hickenlooper, Governor | Mike King, Executive Director | Virginia Brannon, Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.