My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-15_REVISION - M2007044 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007044
>
2014-09-15_REVISION - M2007044 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:12:34 PM
Creation date
9/24/2014 7:05:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
Revision
Doc Date
9/15/2014
Doc Name
Incomplete, Legal Right to Enter for Verification
From
Energy Fuels Resources (USA) Inc.
To
DRMS
Type & Sequence
SO1
Email Name
THM
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLAN CONFORMANCE AND CONSISTENCY <br /> The Proposed Action and alternatives have been reviewed and found to be in conformance with <br /> the Grand Junction Resource Area (now referred to as the Grand Junction Field Office) <br /> Resource Management Plan (RMP) and Record of Decision (ROD) dated January 1987 and the <br /> BLM Moab Field Office Grand Resource Area RMP and ROD, dated June 1985. <br /> The Grand Junction Field Office RMP states (page 2-5) that existing withdrawals from mineral <br /> locations on 124,443 acres would continue, and recognizes the development of minerals as <br /> important to local economies and national interests. An objective of the RMP for minerals <br /> management (page 2-5) calls for"making public lands available to exploration and development <br /> under the general mining laws" unless the lands are otherwise withdrawn to protect other <br /> resources. No lands in the proposed project area are classified as withdrawn from minerals <br /> management. <br /> The Moab Field Office RMP, under its Goals and Objectives section (page 15), calls for land <br /> managers "to keep public lands open for exploration and development of mineral resources <br /> while protecting areas with sensitive resource values". In part, the Minerals section states (page <br /> 22): "leave the entire Grand Resource Area (1.8 million acres) open to mining claims for <br /> locatable minerals under the General Mining Laws, with exception of 1,850 acres of widely <br /> scattered campgrounds and scenic sights under existing mineral withdrawals". The proposed <br /> project area is not within the 1,850 acres under existing mineral withdrawals. <br /> FINDING OF NO SIGNIFICANT IMPACT <br /> Based upon review of the EA, I have determined that the Proposed Action will not significantly <br /> affect the quality of the human environment, individually or cumulatively with other actions in the <br /> area. There are no effects described in the EA that meet the definition of significance in context <br /> or intensity as defined in 40 CR 1508.27. Therefore, an environmental impact statement is not <br /> needed. This finding is based on the context and intensity of the project as described in the <br /> Finding of No Significant Impact(FONSI)for the project. <br /> DECISION <br /> It is my decision to authorize Energy Fuels' Plan of Operations for the Whirlwind Mine. This <br /> decision is contingent upon meeting all protective mitigation measures described in Attachment <br /> A and meeting all the sampling, monitoring, and reporting requirements described in Attachment <br /> B. <br /> Conditions of Approval <br /> Several protective/mitigation measures were described in Chapter 4 of the EA. Many of the <br /> measures are requirements, stipulations, and conditions included in other permits and/or <br /> approvals issued by the Colorado Division of Mine Reclamation and Safety, Mesa County <br /> Department of Planning and Economic Development, and the Colorado Department of Health <br /> and Environment.A list of authorizing actions is provided in Chapter 1 of the EA. All stipulations <br /> and conditions included in other permits and approvals are not necessarily repeated here in this <br /> Decision. The Conditions of Approval that BLM has chosen to include in this Decision are <br /> included as Attachment A. <br /> Whirlwind Mine Decision Record 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.