My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-23_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-09-23_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:01 PM
Creation date
9/23/2014 10:32:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
9/23/2014
Doc Name
Letter & Application
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
MR162
Email Name
SLB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX: (970) 242 -7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />September 18, 2014 <br />Susan Burgmaier SEP 2 3 2014 <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 division of Reclamation, <br />Denver, CO 80203 Mining &Safety <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />MR -162, Install temporary culverts at gob pile #2, <br />Revise disturbed area around gob pile #2 <br />Permit C- 1996 -083 <br />Dear Ms. Burgmaier: <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />On behalf of Bowie Resources, LLC (BRL), enclosed is a minor revision application to <br />incorporate two temporary culverts (T -F4 & T -F5) into the gob pile #2 area. Also, to differentiate <br />between permanent and temporary culverts, temporary culverts have been renamed to <br />incorporate a T -171 into their name, and will be listed separately on page App. B -2. Temporary <br />culverts approved with MR -161 and TR -89 have been revised to reflect the new naming <br />convention. <br />Culverts that have been renamed with this revision: <br />C -F5 (TR -89) - Culvert T -F1 <br />C -F5 (MR -161) - Culvert T -F2 <br />C -F6 (MR -161) - Culvert T -F3 <br />In order to install Culvert T -F5, a new disturbance will be created. The area that will be <br />disturbed could be up to 0.9 acres between Topsoil stockpile E and Gob Pile #1. It is unlikely <br />that the entire area will be disturbed at this time, but the whole area is included in the material <br />balance for conservatism. All topsoil salvaged will be placed in topsoil stockpile E, or placed on <br />gob pile #4 which is currently undergoing final reclamation. Appendix A and Map -32 have been <br />revised to account for the new disturbed area and required topsoil replacement volumes. <br />Enclosed are revised pages /maps Volume 11 - Map 32, Volume IX - B -2, B -100 to B -107, <br />Appendix A and a reclamation estimate. <br />Sincerely, <br />Tamme Bishop, P.E. <br />Project Engineer <br />Cc: Bill Bear, Bowie Resources, LLC (electronically) <br />
The URL can be used to link to this page
Your browser does not support the video tag.