Laserfiche WebLink
It <br />Mr. Robert Zuber, P.E. <br />September 19, 2014 <br />Page 3 <br />d On Map 2.05.3(=1) -9 the elevation of the emergency spillway invert is inconsistent; it is <br />labeled as 5682 feet in some places and 5681 feet on the plan view. <br />Response: Map 2.05.3(4) -9 has been completely updated. With these revisions to the <br />map, the elevation issue for the emergency spillway has been corrected. <br />e. On Map 2.05.3(4) -9 Section B -B ' implies that the emergencv spillway is on top of the <br />primary spillway. This appears to be an error. Perhaps an additional cross - section is <br />appropriate. <br />Response: Map 2.05.3(4) -9 has been completely updated. With these revisions to the <br />map, the B -B' Section has been corrected. <br />f. On Map 2.05.3(4) -9, for Ditch NHN -002 North there is no cross- section for the 1 % slope. <br />Response: Map 2.05.3(4) -9 has been completely updated. Please see the revised map <br />included herein. <br />Also included with this adequacy response package are a change of index sheet to ease <br />incorporation into the permit document, and materials revised in response to your adequacy comments. If <br />you have any questions regarding the enclosed adequacy review responses, please contact Chris Gilbreath <br />at (303) 254 -3291 or cgilbreath(htristategt.org. <br />Sincerely. <br />Daniel J. Casiraro <br />Senior Manager <br />Environmental Services <br />DJC:TT:pvt <br />Enclosures <br />cc: Frank Ferris, WFC (via email) <br />Chris Gilbreath (via email) <br />Ross Gubka, WFC (via email) <br />Jason Storey (via email) <br />Tony Tennyson (via email) <br />AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER <br />A Touchstone Energy "Coollerttive <br />..,: <br />