TRI -STATE GENERATION AND TRANSMISSION ASSOCIATION, INC. <br />HEADQUARTERS: P.O. BOX 33695 DENVER, COLORADO 80233 -0695 303 - 452 -6111 <br />September 19, 2014 <br />Mr. Robert Zuber, P.E. <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 O <br />Denver, CO 80203 <br />RE: New Horizon North Mine <br />Permit No. C- 2010 -089 <br />TR -06 Adequacy Review Responses `s`oo of R &Sam �y <br />Dear Mr. Zuber: p�v Mso�rg <br />Tri -State Generation and Transmission Association, Inc. (Tri- State) has received your adequacy <br />letter for TR -06, dated July 17, 2014 and provides the following responses to your comments on behalf of <br />the Western Fuels - Colorado, A Limited Liability Company (Western Fuels- Colorado) New Horizon <br />North Mine. <br />1. This submittal indicates that the schedule for mining at New Horizon North will be delayed by <br />approximately two years. Please explain ifthis will or will not be an issue in the context of the <br />need for contemporaneous reclamation (Rule 4.13). <br />Response: In this technical revision application, the proposed mining boundary has been revised <br />to take into account the recently approved wetland delineation so that no mining is proposed <br />within wetland areas. Also, the mining schedule has been revised to reflect the most current New <br />Horizon North budget timing. Therefore, the Reclamation Time Table in Table 2.05.4(2)(a) -1 has <br />also been updated to reflect this change in mining schedule in order to comply with Rule 4.13 as <br />it applies to contemporaneous reclamation. <br />2. This submittal indicates that the post- mining topography will change. Please address this change <br />in other applicable parts of the Permit Application Package, including (but not necessarily <br />limited to) Map 2.05.4 -1 and Map 2.05.4 -2. Please explain if the change in topography impacts <br />the analysis of other ponds (e.g., Pond NHN 001). <br />Response: The previous submittal contained a post -mine topography that may be submitted to <br />the Division in the future. Therefore, Map 2.05.3(4) -1 and Map 2.05.3(4) -9 have been updated <br />with the currently approved post -mine topography. <br />3. In Section 2 05.3(4) it is unclear what has been changed. The cover letter says pages I — 6, but <br />only four of these pages were submitted. Please confirm that page I and page 5 had no changes. <br />In the Table of Contents, "Design Methodology " was deleted: is this an error? The format of <br />headings appears to be inconsistent: please correct this. <br />Response: The headings, subheadings, and Table of Contents have been revised to make this <br />entire section clearer. Therefore Section 2.05.3(4) is being submitted in its entirety as part of this <br />adequacy response. The pages that have had a revision of content are dated differently and <br />labelled with the TR -06 in the footer. <br />AN EQUAL OPPOWUNII Y.'AFFIRMATIVE ACTION EMPLOYER CRAIG STATION ESCALANTE STATION NUCLA STATION <br />P.O. BOX 1307 P.O. BOX 577 P.O. BOX 698 <br />A Touchstone Encrgv' Cooperative ?11� t CRAIG, CO 81626 -1307 PREWITI, NM 87045 NUCLA, CO 81424 -0698 <br />- 970- 824- 4411 505- 972 -5200 970 - 864 -7316 <br />