Laserfiche WebLink
RECEIVED <br /> SEP 18 2014 Page 2 of 3 <br /> 110c Annual Report DIVISION OF R TY MINEERALS <br /> FE REPORT MAP MW <br /> Permittee Name: Brice F Lee&Phyllis J Lee Permit Number: M-1977-546 <br /> Operation Name: Horvath Pit No 1 County: La Plata <br /> Annual Fee Due: $323.00 Anniversary Date: July 26, 2014 <br /> Permit Acreage: 3.00 Current Bond Amt: $1,376.00 <br /> According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br /> the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land,required <br /> monitoring information,reclamation accomplished to date and during the preceding year, any new disturbance that is <br /> anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations,and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br /> act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1). G) NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). (�ap NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? o NO <br /> If"YES,"please note time limits related to completion of reclamation,Rule 3.1.3. <br /> 4. What was the date of last excavation,processing or hauling activity at the mine? <br /> 5. Does the mine operate more than 180 days per year? YES <br /> If"NO",please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a)approval of TEMPORARY CESSATION Status? YESO <br /> b) approval for INTERMITTENT OPERATION? YES <br /> 7. Number of acres currently affected(mining+incomplete and or unreleased reclamation). <br /> 8. Number of acres that were newly affected during the current report year. <br /> 9. Number of acres that were reclaimed during the current report year. <br /> 10. Estimated new acreage to be affected in the next report year. <br /> 11. Estimated acres to be reclaimed in the next report year. O <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: seeded w/ L w/topsoil mulched w/ <br /> approved mix.! replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: fertilized w/ replacement / rate(tons/ac): <br /> apvd fertilizer: depth(in.): (� <br /> Seed Fertilizer Mulch <br /> application / application application ' <br /> method: ` a`� method: / ✓1G51" method: <br />