My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-17_REVISION - M1977252
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977252
>
2014-09-17_REVISION - M1977252
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:19:10 PM
Creation date
9/18/2014 8:43:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977252
IBM Index Class Name
Revision
Doc Date
9/17/2014
Doc Name
TR Submittal- Inert Fill Import.
From
General Shale Brick
To
DRMS
Type & Sequence
TR4
Email Name
TAK
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Aso <br /> General Shale <br /> Building The American Dream' <br /> August 21 , 2014 � G <br /> Colorado Division of Reclamation, Mining, and Safety RECEIVEDMr. Tyler O'Donnell <br /> Environmental Protection Specialist <br /> 1313 Sherman Street, Room 215 SEP 1 ' LZm <br /> Denver, CO 80203 DIVISION OF RECLAMATION <br /> Re: M-1977-252 Pioneer Mine, Douglas County, Colorado MINING AND SAFETY <br /> Technical Revision Inert Fill Import <br /> Dear Mr. O'Donnell: <br /> General Shale Brick, Inc. (GSB) is providing Technical Revision JR) which is a notice of intent to <br /> backfill inert structural fill, generated outside of the permit area at the Pioneer Mine per rule 3.1.5.9. <br /> We have enclosed a check for the TR fee of $216. <br /> Placement of the scrap brick will assist in site reclamation by providing additional fill material as <br /> replacement for mined materials. <br /> The inert fill material will consist of scrap brick generated from the GSB's Denver brick plant. We <br /> anticipate placing 20,000 tons of scrap brick into the pit. An affidavit is attached certifying that the <br /> scrap brick mix is inert and "clean". <br /> We plan on hauling the scrap brick and placing it on the clay stockpile pad areas (inside the current <br /> disturbance boundary). Then when concurrent reclamation begins approximately in 2018 we will <br /> place the scrap brick into the pit. We do not anticipate any settling and voids due to the placement of <br /> these materials because the materials will be placed in 5-10 foot lifts, blended with the current <br /> overburden materials and compacted. The scrap brick will be hauled starting on or about September <br /> 29, 2014 and ending September 29, 2024. <br /> These materials will not impact surface water runoff quality, because these materials does not contain <br /> contaminants, and local area storm water runoff is diverted away from the mine disturbed area. The <br /> scrap brick will not contaminate ground water because it has been fired to a high temperature. <br /> Further, these materials will not be placed below the saturated zone. <br /> Please feel free to contact me with any questions at 303-783-3058. <br /> Sincerely, <br /> General Shale Brick, Inc. <br /> f � <br /> Jason E. McGraw PE <br /> Mine Supervisor <br /> Enc: Affidavit and Check for TR Fee <br />
The URL can be used to link to this page
Your browser does not support the video tag.