My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-16_PERMIT FILE - M2012032
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2012032
>
2014-09-16_PERMIT FILE - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:46 PM
Creation date
9/17/2014 2:45:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
PERMIT FILE
Doc Date
9/16/2014
Doc Name
Revenue Mine Material Containment Plan
From
Fortune Revenue Silver Mines, Inc.
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fortune Revenue Silver Mines Inc. Revenue Mine MCP Plan 2014 <br />3.6.2 Monthly Inspection <br />The checklist provided is used for monthly inspections by Star Mine Operations personnel. The monthly <br />inspections cover the following key elements: <br />• Observing the exterior of aboveground storage tanks, pipes, containers, and other equipment for <br />signs of deterioration, leaks, corrosion, and thinning. <br />• Observing the exterior of portable containers for signs of deterioration or leaks. <br />• Observing tank foundations and supports for signs of instability or excessive settlement. <br />• Observing the tank fill and spill/release pipes for signs of poor connection that could cause a <br />spill/release, and tank vent for obstructions and proper operation. <br />• Verifying the proper functioning of overfill prevention systems. <br />• Checking the inventory of spill /release response equipment and restocking as needed. <br />• Check all types of secondary containment (vertical walls and epoxy coatings) on site for damage. <br />All problems regarding containers, tanks, piping, containment, or response equipment must immediately <br />be reported to the Facility Manager. Visible leaks from tank walls, piping, or other components must be <br />repaired as soon as possible to prevent a larger spill or a spill /release to navigable waters or adjoining <br />shorelines. Pooled liquid is removed immediately upon discovery. The Monthly Inspection Checklist is <br />included in this section and the inspection will be conducted during normal seasonal operation of the <br />site. <br />Written monthly inspection records are signed by the Facility Manager and maintained with this MCP <br />Plan for a period of five years. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.