Laserfiche WebLink
September 10, 2014 X- 2006 - 214- 01/BTU Empire 2006 Expl Project JDM <br />Inspection Topic Summary <br />NOTE: Y= Inspected N =Not Inspected R= Comments Noted V= Violation Issued NA Not Applicable <br />N <br />- Air Resource Protection <br />N - Roads <br />N <br />- Backfill & Grading <br />Y - Reclamation Success <br />N <br />- Fish & Wildlife <br />R - Revegetation <br />N <br />- Hydrologic Balance <br />N - Slides and Other Damage <br />N <br />- Gen. Compliance With Mine Plan <br />N - Signs and Markers <br />N <br />- Other <br />N - Topsoil <br />COMMENTS <br />This was a coal exploration bond release inspection conducted by Jason Musick of the Divsiion of Reclamation, <br />Mining, and Safety (Division). This was the first inspection conducted associated with SU for X200621401. A <br />request for partial bond release was originally recieved by the Division on March 28, 2012. This inspection is <br />based on a second bond release request (SL2) for one site that was not adequatly reclaimed and for the remaining <br />bond for the site. <br />REVEGETATION — Rules 2.02(g) and 4.21.4(6): <br />Site WF -003 was found to be unreclaimed during the initial inspection, SL -1 and SL -2. The site showed little to no <br />vegetation growth with a heavy houndstoungue presence throughout. <br />During this inspection, it is noted that the site has been seed with good stands of grass noted throughout. The site <br />did display some bare areas; however, the Division determined native vegetation encroaching the pad and providing <br />additional cover. Weeds were minimal with sparse houndstoungue rosettes noted and evidence of weed spraying <br />cited. <br />Number of Partial Inspection this Fiscal Year: 0 <br />Number of Complete Inspections this Fiscal Year: 0 <br />Page 2 of 4 <br />