My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-03_PERMIT FILE - C1981020A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981020
>
2014-07-03_PERMIT FILE - C1981020A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 9:27:18 AM
Creation date
9/17/2014 9:45:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020A
IBM Index Class Name
Permit File
Doc Date
7/3/2014
Section_Exhibit Name
2.0 Mine Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />LJ <br /> <br />The quantity of flow at SW-1 will be measured quarterly, contingent upon the <br />availability of water. The design of the bridge over East Salt Creek at McClave Canyon <br />was developed to allow easier monitoring of flow. A flow rating chart has been <br />developed to ensure consistence of flow measurements. Flow measurements will also <br />be taken at SW-3, in Munger Creek below the mine site. The measurements will ideally <br />be taken twice a year if water is available to sample. Measurements will be taken once <br />during spring snow melt and once during a storm event. Flow rating charts for both <br />East Salt Creek and for the culvert at SW-3 are presented as Table 2.5-3. <br />Water quality samples of East Salt Creek will be collected quarterly at sites <br />SW-1, SW-4 and SW-8 as shown on Figure 2.3-5. Water quality samples will also be <br />taken on Munger Creek and its tributaries at sites SW-3, SW-6 and SW-7 twice a year; <br />once during spring snow melt and once during a storm event (spring or summer). Table <br />4.5-12 shows the results of the April, 1981 laboratory analyses from East Salt Creek <br />monitoring locations SW-1 and SW-4. All water samples will be analyzed for the <br />parameters shown in Table 2.5-2. The results of all monitoring will be submitted to the <br />Regulatory Authority immediately following receipt of analytical results. <br />During periods of temporary cessation, the monitoring program will be modified <br />as follows: Water quality samples will be taken quarterly from SW-3. Samples will be <br />analyzed for those parameters listed in the temporary cessation portion of Table 2.5-2. <br />The quantity of flow will be measured at SW-3 when samples are collected. <br />Permit Renewal <br />2-29 <br />09/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.