My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-03_PERMIT FILE - C1981020A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981020
>
2014-07-03_PERMIT FILE - C1981020A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 9:27:18 AM
Creation date
9/17/2014 9:45:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020A
IBM Index Class Name
Permit File
Doc Date
7/3/2014
Section_Exhibit Name
2.0 Mine Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Excess material from the construction of the sediment pond and sub-excavation <br />of the gob pile was placed in the cove~ll pile. The surface soil horizon within the Rivra <br />unit and the Torriorthent unit (rock outcrops excepted) was salvaged for topsoil and <br />stockpiled. Alluvial material was salvaged from the foundation of the pile and placed in <br />stockpile. Approximately 5,000 cubic yards of clluvial material was salvaged to <br />provide final cover for the refuse pile. <br />A berm was constructed around the topsoil stockpile to contain any topsoil that <br />may erode prior to the establishment of stabilizing vegetation. A silt fence was installed <br />at the low point(s) in the berm to relieve accumulated run-off. <br />The areas disturbed, including the topsoil stockpile, cover soil stockpile, rock <br />stockpiles, road fill, berms, pond slopes and diversion ditches that are not riprapped, <br />were promptly seeded with the stabilization seed mix. <br />Final reclamation included placing cover material and topsoil on the gob pile and <br />construction and re-construction of the permanent diversion and collection ditches. <br />• Seedbed preparation consisted of extensive roughening by track hoe gouging <br />(pocking). Extensive roughening provides for increased moisture retention and <br />favorable micro sites for plant establishment. <br />Reclaimed areas are seeded and mulched as specified in Section 3.5. <br />RN-05 2-17 09/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.