Laserfiche WebLink
<br />SEDCAD 4.0 <br />(`nn..rie.hf 1UOfL7M7 P~melo 1 CrM.r~h <br />EMERGENCY SPILLWAY -Gob Pond - 25-Year Event - <br />Interim Configuration <br />Culvert Inputs: <br />-. = ~ htax. --~ En~nce <br />th ft Sloe % ~ ~~~Iv~ater - <br />s g {) p ~_) ~an~r tfit~ s n Headwater _ tt Loss Coef~= <br />_- = _ _~~~ ~ ~` _(f~) _ _~) ~~ =(Ke =- <br />80.00 2.00 0.0240 1.50 0.00 0.90 <br />Culvert Results: <br />Minimum pipe diameter: 1 - 21 inch pipe(s) required <br /> <br />r~ <br />u <br />Detai/ed Performance Curves <br />Design Discharge = 5.93 cfs <br />Maximum Headwater = 1.50 ft <br />(BOLD indicates design pipe size) <br />~` <br />Headwater <br />tft) - D~ci-urge ~ISCharg~ -Discharge <br />_ ~~#S) - "---~~- -- v (~s) <br />'- ~ _ <br />0.15 0.20 0.30 0.24 <br />0.30 0.52 0.60 0.70 <br />0.45 0.96 1.11 1.27 <br />0.60 1.47 1.71 1.95 <br />0.75 2.04 2.38 2.72 <br />0.90 2.68 3.13 3.58 <br />1.05 3.38 3.94 4.51 <br />1.20 4.13 4.82 5.51 <br />1.35 4.93 5.75 6.57 <br />1.50 5.33 6.73 7.69 <br />1.65 5.68 7.77 8.88 <br />1.80 6.62 8.66 10.11 <br />1.95 8.14 8.94 11.40 <br />2.10 8.41 9.60 12.74 <br />2.25 8.68 11.90 13.29 <br />SEDCAD Utility Run <br />TR-23 <br />M(vii)-30 <br />1 <br />Printed 12-27-2007 <br />12/07 <br />