My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-16_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-09-16_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:46 PM
Creation date
9/16/2014 2:13:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
9/16/2014
Doc Name
Letter & Application and Public Notice
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR93
Email Name
SLB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX: (970) 242 -7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />September 10, 2014 <br />Susan Burgmaier RECEIVED <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 SEP 16 1014 <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine Division of Reclamation, <br />TR -93, East gob drying area at gob pile #3 Mining & �A,Ai y <br />Permit C- 1996 -083 <br />Dear Ms. Burgmaier: <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />On behalf of Bowie Resources, LLC, enclosed is an application for a technical revision to incorporate a <br />new drying area at gob pile #3. <br />The drying area will be located in the footprint of the existing west coverfill stockpile. Efforts are <br />currently underway to relocate the west coverfill stockpile and create a new stockpile which will be <br />named the north coverfill stockpile. In addition to relocating the existing west stockpile, the footprint <br />must be sub - excavated to at least a depth of fifteen feet in order to meet coverfill reclamation <br />requirements for gob piles #2 & #3. <br />Since the drying area will be on native ground, no stability analyses is required. <br />Berms will be constructed at the low point of the drying area and notches will be cut through the berms <br />to allow the gob to dewater to Ditch J3. <br />No new disturbance will be created with this revision. <br />There will be an additional 50,000 CY of uncompacted refuse at gob pile #3. Therefore, the bond will <br />increase by $39,625. <br />Revised Volume IX page 12 Volume XI pages 4a and 4band a reclamation estimate are attached. <br />Please let me know if you have any questions. Thanks. <br />Sincerely, <br />Tamme Bishop, P.E. <br />Project Engineer <br />Cc: Bill Bear <br />
The URL can be used to link to this page
Your browser does not support the video tag.