My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-15_ENFORCEMENT - C1981014
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981014
>
2014-09-15_ENFORCEMENT - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:42 PM
Creation date
9/16/2014 2:12:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Enforcement
Doc Date
9/15/2014
Doc Name
Response to Abatement & CV-2013-002
From
Energy Fuels Coal, Inc
To
DRMS
Violation No.
CV2013002
Email Name
RDZ
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Form No. OFFICE OF THE STATE ENGINEER <br />GWS -25 COLORADO DIVISION OF WATER RESOURCES <br />818 Centennial Bldg., 1313 Sherman St., Denver, Colorado 80203 <br />(303) 866 -3581 <br />APPLICANT <br />ENERGY FUELS COAL INC <br />PO BOX 459 <br />FLORENCE, CO 81226- <br />(719) 784 -6395 <br />WELL PERMIT NUMBER 294785 - - <br />DIV. 2 WD 12 DES. BASIN MD <br />EXST <br />APPROVED WELL LOCATION <br />FREMONT COUNTY <br />NW 1/4 SW 1/4 Section 19 <br />Township 20 S Range 69 W Sixth P.M. <br />DISTANCES FROM SECTION LINES <br />1450 Ft. from South Section Line <br />100 Ft. from West Section Line <br />UTM COORDINATES (Meters, Zone: 13,NAD83 <br />r.. <br />1: _ AnCnnA 1: - AnIMn ^l <br />VtKnni 1 1 U UJt AN tAlb I INU WILL <br />ISSUANCE OF THIS PERMIT DOES NOT CONFER A WATER RIGHT <br />CONDITIONS OF APPROVAL <br />1) This well shall be used in such a way as to cause no material injury to existing water rights. The issuance of this permit <br />does not ensure that no injury will occur to another vested water right or preclude another owner of a vested water right from <br />seeking relief in a civil court action. <br />2) Construction details for this existing well have not been provided to this office; therefore, it is not known if the construction <br />of this well is in compliance with the Water Well Construction Rules, 2 CCR 402 -2. The issuance of this permit does not <br />relieve the well owner of responsibility or liability in the event contamination of the groundwater source results from the <br />construction or use of this well, nor does the State Engineer assume any responsibility or liability should contamination <br />occur. <br />3) Approved pursuant to CRS 37- 92- 602(3)(b)(1) for uses as described in CRS 37- 92- 602(1)(f). Use of this well is limited to <br />monitoring water levels and /or water quality sampling. <br />4) Approved for the use of an existing well known as MW -NW. <br />5) This well must be equipped with a locking cap or seal to prevent well contamination or possible hazards as an open well. <br />The well must be kept capped and locked at all times except during sampling or measuring. <br />6) Records of water level measurements and water quality analyses shall be maintained by the well owner and submitted to <br />the Division of Water Resources upon request. <br />7) Upon conclusion of the monitoring program the well owner shall plug this well in accordance with Rule 16 of the Water <br />Well Construction Rules. A Well Abandonment Report must be completed and submitted to the Division of Water <br />Resources within 60 days of plugging. <br />8) The owner shall mark the well in a conspicuous place with the well permit number and name of aquifer as appropriate, <br />and shall take necessary means and precautions to preserve these markings. <br />9) This well must be located not more than 200 feet from the location specified on this permit. <br />NOTE: Issuance of this permit does not guarantee that this well can be converted to a production well under a future <br />permit. Additionally, pursuant to Rule 14.2 of the Water Well Construction Rules (2 CCR 402 -2), monitoring holes <br />constructed pursuant to a monitoring hole notice shall not be converted to a production well. (Upon obtaining a permit from <br />the State Engineer, a monitoring hole may be converted to a monitoring well, recovery well for remediation of the aquifer, or <br />a dewatering system for dewatering the aquifer.) <br />APPROVED <br />CRF <br />State Engineer <br />No. 3665081 D DATE ISSUED 07 -29 -2014 <br />By <br />XPIRATIOUDATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.