My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-15_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2014-09-15_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:44 PM
Creation date
9/15/2014 10:01:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
9/15/2014
Doc Name
Adequacy Review Cost Estimate
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
MR160
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />September 15, 2014 <br />Scott Wanstedt <br />Blue Mountain Energy, Inc <br />3607 County Road 65 <br />Rangely, CO 81648 <br />Re: Deserado Mine (Permit No. C- 1981 -018) <br />Minor Revision 160 (MR -160) <br />Adequacy Review <br />Dear Mr. Scott Wanstedt: <br />The Colorado Division of Reclamation, Mining and Safety (Division) has received the Blue <br />Mountain Energy, Inc. (BME) submittal of Minor Revision 160 for the Deserado Mine. The <br />revision was received on September 3, 2014 and deemed completed on September 12, 2014. MR- <br />160 proposes to add a second nitrogen plant and associated facilities. The Division has the <br />following comment: <br />Rule 3.02.2 — Determination of Bond Amount <br />1. The Division has performed a cost estimate for the addition of a second nitrogen plant. The <br />total value of this estimate is $6,747.62 (see attached cost estimate). The Division's cost <br />estimate is consistent with previous cost estimates approved by both the Division and BME. <br />The Division respectfully requests a response from BME with any questions regarding the <br />cost estimate or an acceptance of the Division's estimate. <br />If you have questions or need additional information, please contact me. <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http: / /mining.state.co.us <br />John W. Hickenlooper, Governor I Mike King, Executive Director I Virginia Brannon, Director <br />-'c��a <br />1876 <br />
The URL can be used to link to this page
Your browser does not support the video tag.