Laserfiche WebLink
� N <br />\\ O) <br />V7 <br />EXISTING <br />ORRIGATED FARM <br />LAND <br />1z <br />1 0 1 2 3 <br />IR 'elveD <br />sy 2 14 <br />DIV�SICN CF Rp gpFEPN N <br />M�N�NC PN <br />EXHIBIT C <br />MINING PLAN MAP <br />SCALE: 1" =100' <br />1•: <br />DIRECTION OF DIRECTION OF DIRECTION OF <br />MINERAL MINERAL MINERAL <br />EXTRACTION EXTRACTION EXTRACTION <br />MATERIAL <br />SCREENER <br />1 =III IIIIIIIIIIIII III \ <br />I I -1 I I" .III. 1111 I i <br />I II 1 11 11 =1 I I1 11 =I <br />1.1 11.1 111- 111 I 1 -1 11= <br />11 I_I MATERIAL <br />STOCKPILE <br />I I =1 I I —I I I__I I ll <br />=111 11= ;I I I =1 11 =1 I L <br />— I I� I I1 =1I i =1I1= I I11 I' <br />-IIII - III —I I ! =I 111 11! I 1 <br />1 11= III = -I I 1 —I I LI I'- <br />= III III = - -� MATERIAL <br />- STOCKPILE <br />iITI�L1.1 I- I I <br />i 1.1 \III -III III I I <br />nl _Iil III 111_III �I, <br />1 111 -n1 lil lil III -� <br />-Ill =III III <br />APPROXIMATE CENTER OF <br />MINING LOCATION <br />N 38 -07- 54.43' <br />W 102 -44 -6.32' <br />PORTABLE <br />TOILET <br />OFFICE \ <br />MAN -MADE STRUCTURE: <br />WIRE FENCE - -- - <br />DIRECTION OF <br />MINERAL <br />EXTRACTION <br />TOPSOIL <br />STOCKPILE <br />W <br />W <br />c_ 'U <br />X; > ;a <br />-G0�� <br />m <br />0 ;u <br />o�z <br />Coo <br />a <br />1D z <br />m <br />FRIEDERICHS PIT 112 U <br />NOTE: \ EXISTING - O <br />IF GROUNDWATER IS EXPOSED DURING MINING ACCESS ROAD <br />OPERATIONS EVERY EFFORT WILL BE MADE TO STOP FLOW \\ <br />AND MITIGATE ANY FUTURE GROUNDWATER SEEP. <br />NO EXPLOSIVES WILL BE USED DURING THE MINING \ <br />OPERATION. STONEY POINT \ <br />LATERAL DITCH \ <br />WHILE EXCAVATING- A- HIGHWALL WILL BE CREATED. THE \ <br />WALL WILL BE APPROXIMATELY40' -0" HIGH, AT 1:1 SLOPE, <br />AND POTENTIALL DEEPER TO EXTRACT MATERIAL, AND <br />APPROXIMATELY1100' -0" IN LENGTH ALONG THE NORTH ,l <br />BOUNDARY AT ANY GIVEN TIME DURING THE MINING <br />OPERATION. DEEPER CUTS SHALL BE BACKILLED TO <br />PERMIT DEPTHS WITH -IN 60 DAYS OF EXCVATION. <br />EXISTING ELEVATI <br />NOTE: \ <br />THE SEED B9 WILL BE PREPARED FOR <br />SEEDING BY T ING THE TOP SOIL, RE- <br />COMPACTING T SEED BED, AND <br />PLANTING A WESTERN WHEATGRASS, BLUE <br />GAMMA, INDIAN RY R ASS ,LITTLE <br />BLUESTREAM ANDS EOATS GAMMA. <br />RIVERSIDE AGGREGATO LLC PLANS TO <br />APPLY 8" OF TOPSOIL T HE SITE AND <br />ESTIMATES APPROXIMATE 20,440 C.Y. OF <br />TOPSOIL IS NEEDED TO RECLAIM THE19 M/L <br />ACRES OF LAND. THE ESTIMA7� \COST FOR <br />MATERIAL IS $20,440.00. \ <br />THE TOTAL ESTIMATED VOLUME <br />US <br />TO <br />BACKFILL THE PIT FOR RECLAMATI S <br />BASED ON A PROPOSED SLOPE EQUAL <br />4:1 BEGINNING AT THE NORTH BOUNDA <br />OF THE MINING AREA AND SLOPING TO TH <br />EXISTING ELEVATION AT THE <br />SOUTHWESTERN BOUNDARY. IT IS <br />ESTIMATED THAT THE MAXIMUM LENGTH OF <br />SLOPE ANGLE OF THE HIGHWALL WILL BE <br />40' TO 50' AT ANY GIVEN TIME DURING THE <br />MINING OPERATION. <br />AND GRASS SEED <br />OXIMATE SOUTH TURF_ - <br />EN �� <br />LEGAL RIZiH�TA ENTER <br />N 38 -0745.25' � <br />W 102.43 58.64• - <br />EXHIBIT D <br />RECLAMATION PLAN MAP <br />SCALE: 1 " = 100' - 0" <br />EXISTING ELEVATION <br />TOPSOIL AND GRASS SEED <br />EXISTING ELEVATION <br />\BOUNDARY <br />MARKERS AT EACH CORNER AND <br />AT INTERVALS AND WIRE FENCE ON THE <br />\ <br />NORTH, WEST,, EAST AND SOUTH <br />BOUNDARIES SHALL BE PLACED TO ENSURE <br />\ \ <br />ALL OFFSITE AREAS WILL NOT BE DISTURBED <br />BY MINING OPERATIONS <br />� N <br />\\ O) <br />V7 <br />EXISTING <br />ORRIGATED FARM <br />LAND <br />1z <br />1 0 1 2 3 <br />IR 'elveD <br />sy 2 14 <br />DIV�SICN CF Rp gpFEPN N <br />M�N�NC PN <br />EXHIBIT C <br />MINING PLAN MAP <br />SCALE: 1" =100' <br />1•: <br />DIRECTION OF DIRECTION OF DIRECTION OF <br />MINERAL MINERAL MINERAL <br />EXTRACTION EXTRACTION EXTRACTION <br />MATERIAL <br />SCREENER <br />1 =III IIIIIIIIIIIII III \ <br />I I -1 I I" .III. 1111 I i <br />I II 1 11 11 =1 I I1 11 =I <br />1.1 11.1 111- 111 I 1 -1 11= <br />11 I_I MATERIAL <br />STOCKPILE <br />I I =1 I I —I I I__I I ll <br />=111 11= ;I I I =1 11 =1 I L <br />— I I� I I1 =1I i =1I1= I I11 I' <br />-IIII - III —I I ! =I 111 11! I 1 <br />1 11= III = -I I 1 —I I LI I'- <br />= III III = - -� MATERIAL <br />- STOCKPILE <br />iITI�L1.1 I- I I <br />i 1.1 \III -III III I I <br />nl _Iil III 111_III �I, <br />1 111 -n1 lil lil III -� <br />-Ill =III III <br />APPROXIMATE CENTER OF <br />MINING LOCATION <br />N 38 -07- 54.43' <br />W 102 -44 -6.32' <br />PORTABLE <br />TOILET <br />OFFICE \ <br />MAN -MADE STRUCTURE: <br />WIRE FENCE - -- - <br />DIRECTION OF <br />MINERAL <br />EXTRACTION <br />TOPSOIL <br />STOCKPILE <br />W <br />W <br />c_ 'U <br />X; > ;a <br />-G0�� <br />m <br />0 ;u <br />o�z <br />Coo <br />a <br />1D z <br />m <br />FRIEDERICHS PIT 112 U <br />NOTE: \ EXISTING - O <br />IF GROUNDWATER IS EXPOSED DURING MINING ACCESS ROAD <br />OPERATIONS EVERY EFFORT WILL BE MADE TO STOP FLOW \\ <br />AND MITIGATE ANY FUTURE GROUNDWATER SEEP. <br />NO EXPLOSIVES WILL BE USED DURING THE MINING \ <br />OPERATION. STONEY POINT \ <br />LATERAL DITCH \ <br />WHILE EXCAVATING- A- HIGHWALL WILL BE CREATED. THE \ <br />WALL WILL BE APPROXIMATELY40' -0" HIGH, AT 1:1 SLOPE, <br />AND POTENTIALL DEEPER TO EXTRACT MATERIAL, AND <br />APPROXIMATELY1100' -0" IN LENGTH ALONG THE NORTH ,l <br />BOUNDARY AT ANY GIVEN TIME DURING THE MINING <br />OPERATION. DEEPER CUTS SHALL BE BACKILLED TO <br />PERMIT DEPTHS WITH -IN 60 DAYS OF EXCVATION. <br />EXISTING ELEVATI <br />NOTE: \ <br />THE SEED B9 WILL BE PREPARED FOR <br />SEEDING BY T ING THE TOP SOIL, RE- <br />COMPACTING T SEED BED, AND <br />PLANTING A WESTERN WHEATGRASS, BLUE <br />GAMMA, INDIAN RY R ASS ,LITTLE <br />BLUESTREAM ANDS EOATS GAMMA. <br />RIVERSIDE AGGREGATO LLC PLANS TO <br />APPLY 8" OF TOPSOIL T HE SITE AND <br />ESTIMATES APPROXIMATE 20,440 C.Y. OF <br />TOPSOIL IS NEEDED TO RECLAIM THE19 M/L <br />ACRES OF LAND. THE ESTIMA7� \COST FOR <br />MATERIAL IS $20,440.00. \ <br />THE TOTAL ESTIMATED VOLUME <br />US <br />TO <br />BACKFILL THE PIT FOR RECLAMATI S <br />BASED ON A PROPOSED SLOPE EQUAL <br />4:1 BEGINNING AT THE NORTH BOUNDA <br />OF THE MINING AREA AND SLOPING TO TH <br />EXISTING ELEVATION AT THE <br />SOUTHWESTERN BOUNDARY. IT IS <br />ESTIMATED THAT THE MAXIMUM LENGTH OF <br />SLOPE ANGLE OF THE HIGHWALL WILL BE <br />40' TO 50' AT ANY GIVEN TIME DURING THE <br />MINING OPERATION. <br />AND GRASS SEED <br />OXIMATE SOUTH TURF_ - <br />EN �� <br />LEGAL RIZiH�TA ENTER <br />N 38 -0745.25' � <br />W 102.43 58.64• - <br />EXHIBIT D <br />RECLAMATION PLAN MAP <br />SCALE: 1 " = 100' - 0" <br />EXISTING ELEVATION <br />TOPSOIL AND GRASS SEED <br />EXISTING ELEVATION <br />(/) <br />m <br />F'! <br />O <br />,- <br />O <br />(n <br />D <br />m <br />N <br />O <br />F-L <br />rn <br />.. <br />DRAWINGS PROVIDED BY: <br />Art By Design CAD, LLC <br />1251 County Road LL <br />Wiley, CO 81092 <br />7198294484- <br />PROJECT DESCRIPTION: <br />FRIEDERICHS PIT 112 <br />SHEET TITLE: <br />EXHIBIT C/D <br />NO. <br />DESCRIPTION <br />BY <br />DATE <br />