Laserfiche WebLink
RECEIVED <br />\t ) SEP 1 1 2014 Page 2 of 3 <br />DIVISION OF RECLAMATION, <br />112c Annual Report MINING &sAF€TY LS <br />�FEE�REPOR MAP V* <br />According to C.R.S. 34 -32.5 -116 or 34 -32 -116, each year, on the aruliversary date of the pennit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upconung year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />I» formation contained in this report will be reviewed by the Division upon receipt and prior to die next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). S j NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES `�O <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? SEP7-&4En ,2O141 <br />5. Does the mine operate more than 180 days per year? NO <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation) <br />S. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since pe rmined mining activities began: <br />.5- <br />0 <br />2 S� <br />YES CIO <br />YES ChM) <br />Total acres <br />Pcrmittee Name: <br />Pioneer Sand Company, <br />Inc. <br />Permit Number: <br />M -1980- 037 -I-IR <br />Total acres <br />Operation Name: <br />Ingleside Quarry <br />County: <br />Larimer <br />< 3 <br />w /topsoil <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />October 1, 2014 <br />approved mix: <br />Permit Acreage: <br />86.00 <br />Current Bond Amt: <br />$80,644.00 <br />According to C.R.S. 34 -32.5 -116 or 34 -32 -116, each year, on the aruliversary date of the pennit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upconung year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />I» formation contained in this report will be reviewed by the Division upon receipt and prior to die next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). S j NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES `�O <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? SEP7-&4En ,2O141 <br />5. Does the mine operate more than 180 days per year? NO <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation) <br />S. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since pe rmined mining activities began: <br />.5- <br />0 <br />2 S� <br />YES CIO <br />YES ChM) <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfrlled: <br />seeded w/ <br />< 3 <br />w /topsoil <br />< 3 <br />mulched w/ <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />(, <br />fertilized w/ <br />replacement <br />^' G <br />rate (tons /ac): <br />a vd fertilizer, <br />depth (in.): <br />Seed <br />Fertilizer <br />Mulch <br />application <br />5,:�N <br />application <br />application <br />method: <br />method: <br />method: <br />