Laserfiche WebLink
AVCOLORADO <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 821 <br />Denver, CO 80203 <br />DATE: September 9, 2014 <br />TO: Tyler V. O'Donnell, Environmental Protection Specialist <br />CC: Division 1 Office, District 2 Water Commissioner <br />FROM: loana Comaniciu, P.E. <br />RE: Hatchery Pit, Permit No. M- 2014 -043 SEA ��14 <br />Operator: Bernard Frei, Albert Frei and Sons, Inc., (303) 289 -1837 UV16 un of V,auanoation, <br />Contact: Steve O'Brian, Environment, Inc., (303) 423 -7297 Mining & Safety <br />Sec. 20, Twp. 2S, Rng. 67W, 6th P.M., Adams County <br />CONDITIONS FOR APPROVAL <br />❑ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />® The proposed operation will consume ground water by: ® evaporation, ® dust control, ® water <br />removed in the mined product, ® processing, ® other: dewatering. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />® Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />❑ The applicant has indicated plans to use other water for purposes at the permit site. The <br />source of water for this use is to be obtained from Applicant needs to document that this <br />water was diverted in priority under a water right decreed for such industrial use. Applicant should <br />contact the water commissioner for further information. <br />❑ The applicant has not identified any proposed use of water at the permit site. If water will be used <br />for any purpose at this site, the applicant will need to document that the water was obtained from a <br />legal source, or the water was diverted in priority under a water right decreed for such industrial <br />use. <br />COMMENTS: If stormwater runoff is intercepted by this operation and is not diverted or captured in priority, <br />it must be released to the stream system within 72 hours. This may require a discharge permit from <br />CDPHE -WQCD. Otherwise, the operator will need to make replacements for evaporation. <br />1313 Sherman Street, Room 821, Denver, CO 80203 P 303.866.3581 F 303.866.3585 www.water.state.co.us <br />