My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-10_REVISION - M2001107
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001107
>
2014-09-10_REVISION - M2001107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:41:13 PM
Creation date
9/12/2014 9:46:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
Revision
Doc Date
9/10/2014
Doc Name
Notices SR02
From
DRMS
To
Various
Type & Sequence
SR2
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J &T Consulting, Inc. <br />ion Bond Quantities and Costs <br />Northern Colorado Constructors, Inc. <br />Summary of Unit Costs from Technical Revision #2 <br />Direct costs <br />Ripping Clay and Shale <br />$7.12 <br />Re- applying topsoil 12" thick <br />$2,178.00 <br />/ acre <br />Revegetating disturbed area <br />$820.00 <br />/ acre <br />Dewatering full pit <br />$201.50 <br />/ million gallons <br />Liner Cost (see breakdown below) <br />$59.36 <br />/ linear foot <br />Mobilization <br />$2,500 <br />lump sum <br />Liner Cost Breakdown <br />Ripping Clay and Shale <br />$7.12 <br />/ linear foot <br />Hauling and placement of clay <br />$16.46 <br />/ linear foot <br />Hauling and placement of overburden <br />$5.94 <br />/ linear foot <br />Blending and moisture conditioning <br />$11.80 <br />/ linear foot <br />Compaction to desired density <br />$17.43 <br />/ linear foot <br />QA/QC <br />$0.61 <br />/ linear foot <br />Total Liner Cost <br />$59.36 <br />/ linear foot <br />20 % Total Liner Cost (Regulated Construction Option) <br />$11.87 <br />/ linear foot <br />Overhead and Profit Costs <br />Liability insurance 1.55% of direct cost <br />Performance bond 1.05% of direct cost <br />Profit 10.00% of direct cost <br />Total Overhead Cost 12.60% of direct cost <br />Project Management <br />Engineering and bidding 4.25% of direct cost <br />Management and administration 5.00% of direct cost <br />Total Additional Cost 9.25 % of direct cost <br />Additional Unit Costs <br />Direct costs <br />Scarifying Ground $200 / acre <br />1 of 8 <br />NCC1 Pit 411 <br />
The URL can be used to link to this page
Your browser does not support the video tag.