Laserfiche WebLink
Loader Worksheet Cont'd Task # 001 <br />Total Travel Time: 0.0151 <br />Total Cycle Time: 0.4201 <br />Load Bucket Capacity <br />Rated Capacity: 0.53 LCY (heaped) <br />Bucket Fill Factor: 1.100 Other - rock/dirt mixtures (100 -120 %) 1.100 <br />Adjusted Capacity: 0.58 LCY <br />Job Condition Correction Factors <br />Site Altitude: 8450 feet <br />Page 2 of 2 <br />minutes <br />minutes <br />Source <br />Altitude Adj: 0.95 <br />(CAT HB) <br />Job Efficiency: 0.83 <br />1 (1 shift/day) <br />Net Correction: 0.79 multiplier <br />Unadjusted Hourly Unit Production: 83.26 <br />LCY/Hour <br />Adjusted Hourly Unit Production: 65.65 <br />LCY/Hour <br />Adjusted Hourly Fleet Production: 65.65 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: <br />7.21 Hours <br />Unit cost: $0.954 /LCY Total job cost: <br />$452 <br />CIRCES Cost Estimating Software <br />