Laserfiche WebLink
Mobilization Worksheet Cont' d Task # 003 Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: LAKE GEORGE <br />Total one -way travel distance: 7.00 miles <br />Average Travel Speed: 15.00 mph <br />Total Non - Roadable Mob/Demob Cost * $767.41 <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: $49.26 <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.47 <br />0.47 <br />0.47 <br />0.47 <br />0.25 <br />NA <br />0.25 <br />NA <br />1.43 <br />0.93 <br />Total job time: 2.87 Hours <br />Total job cost: $817 <br />CIRCES Cost Estimating Software <br />