My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-09_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-09-09_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:33 PM
Creation date
9/10/2014 1:13:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
9/9/2014
Doc Name
Pages 2.05-1 to 2.05-83
Section_Exhibit Name
Volume I 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.3 <br />Bowie -2 MR -123 approved six gob vent holes to be drilled in 2011. They are <br />GVB -B11A, B11B, B12A, B12B, B12C & B13A. MR -124 approved two additional <br />holes to be drilled in 2011. They are GVB -B11 C and B1 2D. GVB -B1 2A, 1312B, <br />1312C & BI 3A were drilled in 2012. <br />Bowie -2 TR -73 approved ten gob vent holes and three exploration holes. They <br />are GVB -B12E, GVB -B13B, GVB -B13C, GVB- B13D,GVB -B13E, GVB -B14A, <br />GVB -B14B, GVB -B14C, GVB -B14D, GVB -B14E, SS -6 <br />SS -7 and 2012 -1. GVB -B1 2E, GVB -13136, GVB -B1 3C, GVB- B1 3D,GVB -B13E, <br />GVB -B14A, SS -7 and 2012 -1 were drilled in 2012. The remaining holes were <br />drilled in 2013. <br />Bowie -2 MR -133 approved the 2012 installation of four utility holes to be installed <br />north of the large ventilation fan above the D -Seam portals. MR -133 also <br />approved the 2012 installation of GVB -13F. <br />Bowie -2 MR -134 approved the installation of an emergency vent hole into the <br />B13 tailgate bleeder entry. Due to technical difficulties this vent hole was not <br />installed. The drill pad for the emergency hole was constructed. <br />Bowie -2 MR -135 approved the 2013 installation of an emergency gob vent hole <br />for the 1313 panel (GVB-B 1 3C- 1). <br />Bowie -2 TR -78 approved the 2013 installation of six gob vent holes and one <br />exploration hole. They are GVB -B14F, GVB -B15A and exploration hole SS -8. <br />GVB -B15B, GVB -B15C, GVB -B15D, GVB -B16A will be drilled in 2014. <br />Bowie -2 MR -146 approved the installation of 4,300 feet of 6 inch diameter <br />schedule 80 HDPE pipe adjacent to the existing Pitkin Mesa pipeline. The new <br />pipeline will be located over longwall panels B -15 and B -16. <br />Bowie -2 TR -86 approved the 2014 installation of ten gob vent holes and three <br />exploration holes. They are GVB -B16B, GVB -B16C, GVB -B16D, GVB -B17A, <br />GVB -B17B, GVB -B17C, GVB -B17D, GVB -B17E, GVB -B19A, GVB -B19B and <br />exploration holes 2014 -SS -A, 2014 -SS -B and 2014 -SS -C. <br />Bowie -2 MR -152 approved moving eleven gob vent holes. The 15, 16, 17, 18 <br />and 19 series holes were moved. <br />Bowie -2 TR -90 approved the 2014 and 2015 installation of two gob vent holes <br />GVB -B17F & B19C. TR -90 also relocates GVB -B15A. <br />Bowie -2 MR -155 approved the July 2014 drilling of replacement monitoring well <br />DH- 67blw. <br />MR -155 2.05-49- 07/08/14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.