My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-05_INSPECTION - M1980183
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1980183
>
2014-09-05_INSPECTION - M1980183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:28 PM
Creation date
9/5/2014 4:17:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980183
IBM Index Class Name
INSPECTION
Doc Date
9/5/2014
Doc Name
Citizen complaint and DRMS inspection report
From
DRMS
To
Brannan Sand & Gravel Company
Inspection Date
8/14/2014
Email Name
TOD
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ne�oF o� COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />MINERALS PROGRAM INSPECTION REPORT <br />PHONE: (303) 866 -3567 <br />` <br />1876 * <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />MINE NAME: <br />MINE/PROSPECTING ID #: <br />MINERAL: <br />COUNTY: <br />Stagecoach Pit <br />M- 1983 -067 <br />Sand and gravel <br />Adams <br />INSPECTION TYPE: <br />INSPECTOR(S): <br />INSP. DATE: <br />INSP. TIME: <br />Monitoring <br />Tyler V. O'Donnell <br />August 14, 2014 <br />14:00 <br />OPERATOR: <br />OPERATOR REPRESENTATIVE: <br />TYPE OF OPERATION: <br />Albert Frei & Sons Inc. <br />Ben Frei <br />112c - Construction Regular Operation <br />REASON FOR INSPECTION: <br />BOND CALCULATION TYPE: <br />BOND AMOUNT: <br />Citizen Complaint <br />None <br />$231,191.00 <br />DATE OF COMPLAINT: <br />POST INSP. CONTACTS: <br />JOINT INSP. AGENCY: <br />8/4/2014 <br />None <br />None <br />WEATHER: <br />INSPECTOR'S SIUINATURE: <br />SIGNATURE DATE: <br />Clear <br />�rmw. <br />August 29, 2014 <br />The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Hydrologic Balance and Offsite impacts <br />PROBLEM: Alluvial groundwater is mounding against the slurry wall at the Stagecoach Pit, causing an elevated <br />groundwater table up gradient from the slurry wall. Significant constrictions in alluvial groundwater flow have <br />resulted in elevated lake levels in Zigan Lake. This is a problem for failure to minimize the disturbance to the <br />prevailing hydrologic balance pursuant to C.R.S. 34- 32.5116(4)(h) and for failure to protect areas outside of the <br />affected land from slides or damages occurring during the mining operation pursuant to C.R.S. 34- 32.5 - 116(4)(1). <br />CORRECTIVE ACTIONS: Submit to DRMS by September 22, 2014 a groundwater mounding mitigation plan <br />as either a Technical Revision or Amendment to the permit. The plan must include: <br />1. A detailed description of the measures the operator will take to reduce groundwater mounding outside the <br />Stagecoach Pit to a level that eliminates elevated levels in Zigan Lake, <br />2. A time schedule for implementing the plan, and <br />3. Enough information for DRMS to estimate the cost of implementing the plan (for establishing the amount of <br />required financial warranty). <br />CORRECTIVE ACTION DUE DATE: 9/22/14 <br />Page 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.