My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-09-02_REVISION - M1979191
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979191
>
2014-09-02_REVISION - M1979191
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:30:16 PM
Creation date
9/5/2014 3:18:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979191
IBM Index Class Name
REVISION
Doc Date
9/2/2014
Doc Name
Decision date extension request - AM01
From
GEI Consultants
To
DRMS
Type & Sequence
AM1
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C u <br />September 2 2014 <br />p , <br />GEI Project No. 1405210 <br />Eric Scott <br />Colorado Division of Reclamation, Mining, and Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Three Bells Mine Construction Material Reclamation Permit Decision Date <br />Extension — Land Release Request <br />Dear Mr. Scott, <br />On behalf of our client, Martin Marietta Materials, Inc. (MMM), I would like to <br />request an extension of six (6) weeks to the decision date for the Construction <br />Material Regular (112) Operation Reclamation Permit for the Three Bells Mine. The <br />Three Bells Mine is currently operational under permit number M -1979 -191. <br />MMM plans to submit an application to release land from their permit boundary, <br />which will affect the reclamation permit. To provide for the land release and <br />changes to the reclamation permit, an extension to the decision date will be <br />required. <br />The current decision date for the Three Bells permit amendment is October 22, <br />2014. An extension of six weeks would change the decision date to December 3, <br />2014. <br />Thank you for your consideration. Please let me know the updated status of the <br />decision date for the Three Bells Mine. I look forward to hearing from you soon. If <br />you have any questions, do not hesitate to contact me at the contact information <br />below: <br />Mr. Jeremy Deuto <br />c/o GEI Consultants, Inc. <br />2625 Redwing Rd., Suite 370 <br />Ft. Collins, CO 80526 <br />Office: (970) 224 -7343 <br />Mobile: (303) 775 -2063 <br />Sincerely, <br />Jeremy Deuto, PG, EIT <br />�k �\ gciconsultants.com GEI Consultants, Inc. <br />4601 DTC Boulevard, Suite 900, Denver, CO 80237 <br />303.662.0100 fax: 303.662.8757 <br />
The URL can be used to link to this page
Your browser does not support the video tag.