Laserfiche WebLink
RECEIVED <br />Mkt' StP 022014 <br />DIVISION OF RECLAMATION, <br />TY- MINERALS ZEE E0 , <br />110c Annual Report <br />Page 2 of3 <br />Pennittee Name: <br />EMEX <br />Permit Number: <br />M- 1977 -361 <br />Operation Name: <br />CEMEX Sandstone Quatry <br />County: <br />- -- <br />Boulder <br />Annual l=ee Due: <br />$323.00 <br />Anniversary Date: <br />September 8, 2014 <br />Permit Acreage: <br />10.00 <br />Current Bond Amt: <br />$223,700.00 <br />According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring inforination, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(l). YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br />KL?C.4A \j Cvt"rc, A, 1,.-, \\ be SUa� <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year? <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report year. <br />9. Nunnber of acres that were reclainmed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various sr wPz <br />YES NO <br />YES WO) <br />YES O <br />Total acres <br />- -'• •-- • -•••• •••..... —Mw ICUUUiCU minln g activities be Tan: <br />Total acres Total acres <br />baekftlled: <br />1 , 5 seeded w/ <br />U �% w /topsoil <br />Total acres <br />mulched w/ <br />Total acres <br />a roved mix: <br />Total acres <br />re laced: <br />a roved mulch: <br />graded: <br />fertilized w/ <br />Topsoil <br />U replacement <br />�� Mulch application <br />Z pp <br />rate (tons /ac): N�A <br />a vd fertilizer: <br />de th (in.): <br />Seed <br />application <br />Fertilizer <br />application2, <br />'1�5� <br />MUICII <br />application N <br />method: <br />method: <br />method: <br />