Laserfiche WebLink
TWENTYMILE COAL, LLC — FOIDEL CREEK MINE <br />MINOR REVISION MR12 -282 — TEST EXCAVATION, <br />INITIAL SUPPORT, AND STAGING <br />SUMMARY OF REVISIONS /ADDITIONS (09/14) <br />REVISION /ADDITION <br />DESCRIPTION <br />PLACEMENT INSTRUCTIONS <br />TABLE OF CONTENTS <br />List of Exhibits — Page vii <br />Revised List of Exhibits reflecting <br />Replaces Page vii in Volumes I, <br />I <br />MR14 -282 <br />and II -IIE <br />ENVIRONMENTAL RESOURCE INFORMATION ULE 2.04 <br />Page2.04 -11 <br />Revised text addressing hydrology <br />Replaces Page 2.04 -11 in Volume <br />in upper portion of Wadge/Wolf <br />I <br />Creek interburden <br />OPERATIONS PLAN — MINE FACILITIES ULE 2.05 <br />Page 2.05 -3, 3.1, and 7.2 <br />Revised text incorporating WCR <br />Replaces Pages 2.05 -3, 3. 1, and <br />test excavation and initial support <br />7.2in Volume I <br />Tans <br />EXHIBITS <br />Exhibit 54 — Wolf Creek <br />Design drawings for test excavation <br />Insert after Exhibit 53 in Volume <br />Reserve Construction <br />and initial support activities <br />II -E <br />and Development Plans <br />